On page 23-02 step 5 the forward edge of the F-01234 needs to be flush with the marked line on the longeron. Before match drilling. I decided to put the outside of the forward edge of the F-01234 flush with the outer point of the line on the longeron. And kept going. But maybe I made a mistake doing it that way?
This way?
I choose for this way with the outside edge of the 01234 flush with the marked line on the longeron
Hopefully correct
This way?
I choose for this way with the outside edge of the 01234 flush with the marked line on the longeron
Hopefully correct
Last edited: