I'm about to tackle the landing light cutout. Anybody have an opinion as to whether it would be best to do the cut on the bench, before installing the skin, at the cleco stage, or after the skin has been fully rivetted. Most builders so far seem to have retro fitted the light kit, so have had to go with the third option. I like the idea of being able to deburr and clean everything up away from the wing structure, but am a little concerned about forming the leading edge curve with the hole cut into it. Any thoughts?
Dave Hastwell
120485
Dave Hastwell
120485