Hi folks,
(I think I've overlooked something obvious.) Can anyone point me to the documentation for initial power up of the avionics? I've installed the panel, but not yet connected the battery to power things up. I'm assuming that there's a check list to verify correct connectivity and installation of the various databases, but I don't recall ever seeing such.
Any pointers gratefully appreciated,
-dbh
(I think I've overlooked something obvious.) Can anyone point me to the documentation for initial power up of the avionics? I've installed the panel, but not yet connected the battery to power things up. I'm assuming that there's a check list to verify correct connectivity and installation of the various databases, but I don't recall ever seeing such.
Any pointers gratefully appreciated,
-dbh