W WVM Well Known Member Feb 11, 2015 #1 Should I dimple the two holes from the E-905 root rib where they connect to the E-907 spar? The plans are not really clear, but I think I should. While the holes on the gusset E-921 should not be flush. Is that a correct interpretation? Thank you!
Should I dimple the two holes from the E-905 root rib where they connect to the E-907 spar? The plans are not really clear, but I think I should. While the holes on the gusset E-921 should not be flush. Is that a correct interpretation? Thank you!
mikehoover Well Known Member Feb 11, 2015 #2 That is what I am seeing on DWG 4. LEFT ELEVATOR TOP VIEW: "AN426AD3-3.5 All root rib to trim spar rivets." EXPLODED ISOMETRIC VIEW: "AN470AD4-4 All gusset to root rib and trim spar rivets."
That is what I am seeing on DWG 4. LEFT ELEVATOR TOP VIEW: "AN426AD3-3.5 All root rib to trim spar rivets." EXPLODED ISOMETRIC VIEW: "AN470AD4-4 All gusset to root rib and trim spar rivets."