K Kojo Member Jan 16, 2022 #1 Anyone have a good sequence approach to tube hook-up for AOA & Pitot tube connections that allow easy connection of the assembly through the access plate over the bellcrank assembly? Gretz plate already installed.
Anyone have a good sequence approach to tube hook-up for AOA & Pitot tube connections that allow easy connection of the assembly through the access plate over the bellcrank assembly? Gretz plate already installed.
mburch Well Known Member Patron Jan 16, 2022 #2 Lots of ways to do this - here's one: https://vansairforce.net/community/showthread.php?t=197793