rv9aviator
Well Known Member
I'm having a problem understanding the instructions on assembling the F633 Control mounts, WD-610 control column, and Wd 611-612 control bases. The instructions say to assemble these parts before the bulkhead halves are bolted together as it is out in the open. It says when completed leave the F633 mounts bolted to the bulkhead and store the other assembled parts. The problem is you can't take the bolt out that goes through the F633 mount without taking the Wd611-612 control bases off the control column. That defeats the whole process since all the little washer spacers you have to insert between parts is the hard part. If you could leave the F633 mounts assembled to the control column and bases and then bolt it to the bulkhead later then you would have made the job much easier. Does anyone know if you can get the bolts and nuts through the F633 mount into the bulkhead after the two bulkhead halves have been assembled? I must be missing something here. I apologize if this is hard to understand but if you have been there done that I'm hoping it will make sense.
Thanks
Thanks