idleup

Well Known Member
When you get the QB fuse the F-721B Aft Canopy Deck is already riveted the whole length of the longerons with final AN426AD3 rivets
(DWG-25 and DWG-18) and the F-705G angle brackets are not rivted on yet (DWG-20). How are you supposed to rivet the F-705G to the F-
705 Bulkhead assembly with the F-721B in place? I removed the F-757 which was pop riveted in place so I could get better access, but the
F-721B flange is still in the way.

Hopefully someone will know what I am talking about as this has me stumped...

- Matt