I finished closing up my tanks today, now waiting on Proseal to cure so I can leak check
A few questions.
1. Plans call for countersinking, then prosealing remaining rivet holes in rear baffle. This step is to be done after Proseal has cured..... how long should I wait? Clecos with blue tape.
![5B7CE0D9-A813-420C-A4F9-9BC1DC7DBFD2.jpg 5B7CE0D9-A813-420C-A4F9-9BC1DC7DBFD2.jpg](https://vansairforce.net/data/attachments/0/192-57fa52dd47a20b61a7fbe199f4132cc5.jpg)
2. Most folks say to wait a week or two to allow Proseal to cure before leak checking. Is there any guidance on how I can tell when the Proseal is fully cured? I planned on waiting at least a week.
3. Can I countersink, Proseal and rivet these 14 or so holes in the baffle when the Proseal has cured enough not to show a fingerprint
A few questions.
1. Plans call for countersinking, then prosealing remaining rivet holes in rear baffle. This step is to be done after Proseal has cured..... how long should I wait? Clecos with blue tape.
![5B7CE0D9-A813-420C-A4F9-9BC1DC7DBFD2.jpg 5B7CE0D9-A813-420C-A4F9-9BC1DC7DBFD2.jpg](https://vansairforce.net/data/attachments/0/192-57fa52dd47a20b61a7fbe199f4132cc5.jpg)
2. Most folks say to wait a week or two to allow Proseal to cure before leak checking. Is there any guidance on how I can tell when the Proseal is fully cured? I planned on waiting at least a week.
3. Can I countersink, Proseal and rivet these 14 or so holes in the baffle when the Proseal has cured enough not to show a fingerprint