tx_jayhawk
Well Known Member
I'm either clearly confused, or Van's shipped me a bad part.
I have the flap weldment in place trying to drill for the center bearing block. The instructions have you position it on the non-powdercoated area of the weldment, which should allow you to drill through the floor and rib to mount the nutplate.
My bare spot on the weldment will not allow the bearing block to be positioned over the rib. Best I can tell, the bare spot should be centered about 1" from the actuator tube, but it appears that mine is 2". I don't want to mount it there, as I will not have a back rib to go through.
I've read on the internet of others who had th bare spot on the wrong side (right vs left), but am I the only one to have this problem?
Thanks,
Scott
7A Fuse
I have the flap weldment in place trying to drill for the center bearing block. The instructions have you position it on the non-powdercoated area of the weldment, which should allow you to drill through the floor and rib to mount the nutplate.
My bare spot on the weldment will not allow the bearing block to be positioned over the rib. Best I can tell, the bare spot should be centered about 1" from the actuator tube, but it appears that mine is 2". I don't want to mount it there, as I will not have a back rib to go through.
I've read on the internet of others who had th bare spot on the wrong side (right vs left), but am I the only one to have this problem?
![dsc008571nr.jpg](/community/proxy.php?image=http%3A%2F%2Fimg291.imageshack.us%2Fimg291%2F1619%2Fdsc008571nr.jpg&hash=0cfab52acfde0f8255a86d788537e1ba)
Thanks,
Scott
7A Fuse