R Rivethead Well Known Member May 5, 2007 #1 I've just returned from my trip to have the first run done on the engine I've assembled. After 2.2 hours of run time the numbers are better than I expected. It's a IO-360 with Lasar mags.
I've just returned from my trip to have the first run done on the engine I've assembled. After 2.2 hours of run time the numbers are better than I expected. It's a IO-360 with Lasar mags.
rjcthree Well Known Member May 5, 2007 #3 WherE/wHO? Who did you go to for your run-in, and about how much was it? Thanks, Rick 90432
R Rivethead Well Known Member May 5, 2007 #4 8.5 to 1 and Ly-Con in Visalia Cal. did the run in for a fair chunk of change.