Ottertrack
Member
I've searched through the drawings and read through the instructions and have not been able to determine when it is time to rivet F-704C & D to the F-704A & B. I'm wondering if I need to wait until later. Drawing 22 exploded view tells me I can do the riveting during the "Assembling the F-704 Bulkhead" as described on page 8-2. Perhaps I am complicating this too much? Thanks.