Dbro172
Well Known Member
Can I install the engine while the aircraft is on my lowered fuselage cart or will this impose problems for installing the gear (tricycle) later? I have my gear on now and was surprised at how tall the -9A stands. I was especially surprised how high i needed to jack it in the air to stab the gear legs in the hole!
I think it will be hard to finish the cowling at this height.
Once the engine is on, do you hoist the fuselage from the engine mount, or from the picking eye on the engine?
Once the engine is on, do you hoist the fuselage from the engine mount, or from the picking eye on the engine?