Well, milestone weekend for me.
I completed the trim tab on my left elevator, that means the empennage is completed for now (some rivets left out for pre-close inspection here in Canada)
If anyone is interested, I counted the rivets and I'm at 2171. Add the missing ones for the inspection to that and you realize tha the emp has a lot of rivets for its size!
Good news from Van's : my wings(slow build) were loaded in the truck on friday! Yay. ETA is next tuesday, May 5th. I can't wait to get my hand on those 2 crates.
I completed the trim tab on my left elevator, that means the empennage is completed for now (some rivets left out for pre-close inspection here in Canada)
![DSC03633a.jpg](/community/proxy.php?image=http%3A%2F%2Fwww.llavalle.ca%2Fgallery%2Fd%2F961-2%2FDSC03633a.jpg&hash=797917bc62fea526d191dc66d13b6ac5)
![22-02-09_1711.jpg](/community/proxy.php?image=http%3A%2F%2Fwww.llavalle.ca%2Fgallery%2Fd%2F716-2%2F22-02-09_1711.jpg&hash=df4d7a4afb37995f88c1405d55b13a85)
If anyone is interested, I counted the rivets and I'm at 2171. Add the missing ones for the inspection to that and you realize tha the emp has a lot of rivets for its size!
Good news from Van's : my wings(slow build) were loaded in the truck on friday! Yay. ETA is next tuesday, May 5th. I can't wait to get my hand on those 2 crates.