Future RV 9 Flyer

Active Member
My elevators are done and I started to hang them to check for correct throw and to drill the control horn but a 7 builder was told to wait until the hs is mounted on the fuselage.Should I wait also?
 
David that RV7 builder is smart listen to him :) Good job on elevators - the most challenging parts in all empennage.
 
Ah, timely post. :) I'm almost done with my right one, started drilling the left one last night, and was loathing the idea of yanking my HS out of storage for just a quick temporary attaching. Will be in OSH all week roaming around, maybe we'll run into each other.