Robert M
Well Known Member
OK - directions say....Starting at the bottom of page 6-6 of RV-9 Empennage (condensed a bit).....
Cleco the end rib and spar to the bottom elevator skin surface. Clamp (clamp?) the Wd-605 to the corner made by the rib and spar. Align tube with center of spar. After all is aligned and clamped - match drill the end rib and spar using the holes in the Wd-605 as a drill guide.
How in the world do you drill the holes for the Wd-605 in the spar with the skin in the way? Is this where that angle drill thingy comes into play? Can I use just clecos to hold it in place while I drill?
Cleco the end rib and spar to the bottom elevator skin surface. Clamp (clamp?) the Wd-605 to the corner made by the rib and spar. Align tube with center of spar. After all is aligned and clamped - match drill the end rib and spar using the holes in the Wd-605 as a drill guide.
How in the world do you drill the holes for the Wd-605 in the spar with the skin in the way? Is this where that angle drill thingy comes into play? Can I use just clecos to hold it in place while I drill?