Clarkie

Well Known Member
I am in the process of setting up my shop in the garage with the intention of starting the tail kit in a few weeks. That said, I noticed my garage floor is not level and slopes roughly 2 inches from its high point to the the low point at the garage entrance (intentionally done by builder for water drainage purposes.)

My question is this: Do my building surfaces have to be dead on balls level to build this thing? I was planning on building a few workbenches on casters to have the flexibility to move stuff around as I need to.

Thanks.
 
Not a problem.
No need for a level work bench to build the empenage.
You can build a wing stand and level it as needed.
The fuse will have to be leveled occasionally but it is done on saw horses.
 
Tom, what are you building?

A prepunched kit like a 10 is not overly critical with this, but an early design like a 3 it is critical to have an accurate jig-----and that can be done on a sloped floor, but it would be subject to needing reriging if you moved it.