pilot28906
Well Known Member
I have not decided if I am going to build the 7 or 7A and am getting ready to drill the holes in the VS-410PP hinge brackets, spar doubler, and rear spar. The instructions say to leave the bottom outer holes in the bottom bracket untill later to drill for the attachment bolts to the fus. I can see this on print #27 for the 7 model but print 27A seems to show putting flush rivets into the lower outer holes in the bottom bracket and then drilling two holes later for the bolts. Can anyone help here?
Thanks in advance,
John
Thanks in advance,
John