Gsuit
Well Known Member
I searched the archives for this one - to no avail (which makes me feel even more alone
) But, I'm finished with the "Van's" portion of the kit, as far as the metal airplane parts, and can't decide what to tackle next. It seems no matter how I go, I'll need to have something done before something else - but then that gets in the way of this...
I have my engine and my avionics. So, which should I do first? Plumb the engine and all the firewall penetrations, or go get all the stuff for wiring and do all the electrical stuff? If I do them simultaneously, what is a logical progression back and forth?
Also, the engine is at Superior (they're holding it until the sump thing is worked out or until I call for it.) The warranty isn't ticking until they give it to me - is that something I should factor into the equation?
I have my engine and my avionics. So, which should I do first? Plumb the engine and all the firewall penetrations, or go get all the stuff for wiring and do all the electrical stuff? If I do them simultaneously, what is a logical progression back and forth?
Also, the engine is at Superior (they're holding it until the sump thing is worked out or until I call for it.) The warranty isn't ticking until they give it to me - is that something I should factor into the equation?