704CH
Well Known Member
Hey guys, I am at the point where everything per instructions is pretty much done on the fuse and I am about ready to tear it apart for the prep process before final assembly. Looking forward in the plans I am wondering if there are a few things that might be better to do now before waiting until riveted and the canoe is flipped. Any thoughts? Most of these are specific to the tail dragger.. Anything else I should think of?
1) Drill Fit and Rivet the F-7280 angle to the gear attach web (outside support of the cover plate in front of the main spar - tail dragger only.) This seems really difficult to drill and rivet once the gear attach web is riveted.
2) Drill out F7114 Fuse gusset (tail dragger only), to ensure for proper deburing on all those layers of metal involved in this junction.
3) Drill F-695 Fuse Gusset ? The firewall, main longeron gusset to ensure for proper deburing.
1) Drill Fit and Rivet the F-7280 angle to the gear attach web (outside support of the cover plate in front of the main spar - tail dragger only.) This seems really difficult to drill and rivet once the gear attach web is riveted.
2) Drill out F7114 Fuse gusset (tail dragger only), to ensure for proper deburing on all those layers of metal involved in this junction.
3) Drill F-695 Fuse Gusset ? The firewall, main longeron gusset to ensure for proper deburing.