Basic, per plans pitot tube installation. Plans seem to call for a hole to be drilled between two rivets joining the leading edge skin to the spar, just above an access plate nutplate. It would seem to make more sense to just enlarge one of the two predrilled rivet holes, rather than drilling an entirely new hole in the spar and trying to jam it between 2 rivets. Nothing on the wing has been riveted together yet, so I would not be drilling out a pre-existing rivet.
And am I wasting time on this to begin with - all of the search results seem to bring up folks using upgraded, heated pitot systems.
Thanks!
RV-7 Glacially slow build
And am I wasting time on this to begin with - all of the search results seem to bring up folks using upgraded, heated pitot systems.
Thanks!
RV-7 Glacially slow build