aeroaddict
Well Known Member
Building the -706 bulkhead assembly and started to rivet together the -728A Bellcrank Channel and the -728B angle. Then I remembered that the instructions state not to rivet together until later. I have about 1/3 of the rivets installed randomly across the part; a few towards each end and them some across the span.
Since I loathe drilling out AN470 rivets, will there be clearance or interference issues on the final install if I do not drill out the rivets? It looks like there is room to get a yoke in there for the AN426 rivets on final install to the F-706 Bulkhead or I have the option to use the CS4-4 instead of the AN426 on install.
Merry Christmas and Happy Holidays
Since I loathe drilling out AN470 rivets, will there be clearance or interference issues on the final install if I do not drill out the rivets? It looks like there is room to get a yoke in there for the AN426 rivets on final install to the F-706 Bulkhead or I have the option to use the CS4-4 instead of the AN426 on install.
Merry Christmas and Happy Holidays
Last edited: