danielhv
Well Known Member
I was riveting the VS spar tonite, and got all the way down to the bottom... Along the bottom there are several flush rivets. The plans call for AN426AD4-6's on the spar and AN426AD4-7's in the spots where the hinges attach... problem is I ran the -7's where some of the -6's should have been. The -7's on the hinges are fine. But am I ok leaving the -7's where the -6's should have gone?