Found some answeres:
1) Per Section 45A-05 Step 5, the pitot tube from the instrument bay to spinner (FF 1216) is 54.5 inches.
2) By my measurements and going by Section 42D-13, the aft pitot tube section of from the baggage bulkhead to the adhars needs to be a minimum of 71 inches.
3) The FF 1216 engine bay pitot tube needs to be heat resistant, so I will add that when doing the firewall forward Section 45A.
I am currently working on Section 31B and am trying to figure out the placement of the pitot tube. With the above information, i think I am good to go.
As an aside earlier fuselage kits (mine) had the wiring harness had 5/8 snap busings in F-1206A and F-1207B bulkheads. New kits use 3/4 diameter snap bushing. The wiring harness, adsb coax, aft pito tube, and angle of attack tube will not fit through the 5/8 snap bushings, but will tightly fit through the 3/4 snap bushing.
Regards, Dave