I have just finished building and installing an additional storage space in my RV-12.
The need for this came from the fact my wife finds it difficult to travel anywhere without including the kitchen sink!!!! As our combined weight is about 40 lbs less than the 380lbs given in the sample load problem given in the weight and balance section of the POH. This means we can carry an extra 40lbs of luggage, but where to put it and still keep the C of G within the limits with max gross weight.
My solution was to build a locker forward, between the pilot and co-pilot over the tunnel attached to the top cover using their attach screws. This has no affect on any structural part of the airframe.
This structure was bent from .6 mm aluminium sheet and weighs about 1.1 lbs and has a sliding door on top as shown in these photos.
Now I can load the aircraft to get the C of G just right and a handy locker to use in flight.
The need for this came from the fact my wife finds it difficult to travel anywhere without including the kitchen sink!!!! As our combined weight is about 40 lbs less than the 380lbs given in the sample load problem given in the weight and balance section of the POH. This means we can carry an extra 40lbs of luggage, but where to put it and still keep the C of G within the limits with max gross weight.
My solution was to build a locker forward, between the pilot and co-pilot over the tunnel attached to the top cover using their attach screws. This has no affect on any structural part of the airframe.
This structure was bent from .6 mm aluminium sheet and weighs about 1.1 lbs and has a sliding door on top as shown in these photos.
Now I can load the aircraft to get the C of G just right and a handy locker to use in flight.