MrNomad
Well Known Member
We're building a 9A and have a question.
Right now we're attaching the elevators to the horizontal stabilizer. To operate the elevators, a long tube runs thru the fuse. That tube has a bearing on both ends. At the tail, it attaches to the end of the two elevator horns. That's how the elevators operate.
Great so far.
The plan calls for an AN3-10A and no shims between the horns and the bearing at the end of the tube. The gap we have between the horns is much too wide to install an AN3-10A and no shims.
Please look at the attached picture & comment.
http://www.arizonaairparks.com/horn
Barry
Tucson
Right now we're attaching the elevators to the horizontal stabilizer. To operate the elevators, a long tube runs thru the fuse. That tube has a bearing on both ends. At the tail, it attaches to the end of the two elevator horns. That's how the elevators operate.
Great so far.
The plan calls for an AN3-10A and no shims between the horns and the bearing at the end of the tube. The gap we have between the horns is much too wide to install an AN3-10A and no shims.
Please look at the attached picture & comment.
http://www.arizonaairparks.com/horn
Barry
Tucson