I am producing the 705 bulkhead on DWG 20. When I match drill the 705 E doubler to the 705 D bulkhead side channel, I see that the edges have also been matched but there is no call out for rivets. I assume that I am not to match drill or rivet these edges yet, but when I look ahead in the plans, I cannot see where these holes come into play, although I assume that they hold the skin perhaps. If I match drill them later after the doubler has been riveted in, they will not be able to be deburred!
What am I misunderstanding here?
John
What am I misunderstanding here?
John