Thanks Ernst for that bit of motivation you are right. I realized that Monday some oil lines come in; those and hooking up CHT and EGT wires and my engine stuff is mostly done. Still need to rivet the baffle seal on but an engine start is not far off in my future, not to mention a first flight.
I guess I better get the paper work off to the FSDO, the DAR said 3 weeks would be a good lead time for him. Lots to do still, test fuel system W&B, final once over everything.
I can only hope summer lasts a little longer here in the NW, I can see me passing the inspection then having 3 straight weeks of rain! Oh well she flies when she flies. It is nice to realize that next year I will be flying to all the big shows.
Cheers
