Default How to connect components on firewall together

Well, I went off plans, and that has led to more changes then I expected.

This picture shows my firewall passthrough of my main battery cable, the starter soliniod, and the fuseable links for the alternator and backup alternator.

My problem is how do I connect them. They are too close together for even 2 terminals back to back. The Firewall passthough is a 3/8" bolt. I had tried using 1/2" copper busbar stock from B&C, but drilling a 3/8" hole for the bolt does not leave enough material on the sides.

Should I get some 5/8" copper busbar stock or 3/4"? or does anyone have a different solution/idea.
__________________
Bill Thomasson
RV-10 - Flying - Phase II. 99.8% done... it's never really done!
http://sites.google.com/a/fusion4.net/rv10/
Suwanee, GA.
Reply With Quote
  #2  
Old 08-16-2012, 10:49 AM
Mike S's Avatar
Mike S Mike S is online now
Senior Curmudgeon
 
Join Date: Sep 2005
Location: Dayton Airpark, NV A34
Posts: 15,408
Default

Get some 1/2" dia copper pipe.

Cut to the length you need, and then flatten it down.

Drill holes as needed.

You can even use some large heat shrink to cover the center portion.

For other buss bars like circuit breakers, I use a 1" copper coupling, cut off a ring a little wider than 1/4". Cut it open, flatten and there is my buss bar.
__________________
Mike Starkey
VAF 909

Rv-10, N210LM.

Flying as of 12/4/2010

Phase 1 done, 2/4/2011

Sold after 240+ wonderful hours of flight.

"Flying the airplane is more important than radioing your plight to a person on the ground incapable of understanding or doing anything about it."
Reply With Quote
  #3  
Old 08-16-2012, 11:47 AM
Gonzo24 Gonzo24 is offline
 
Join Date: May 2010
Location: NW Ohio
Posts: 128
Talking Wise words to heed, embrace, ponder, meditate on during build

Bill, You nailed it! Wise words indeed and I laughed when I read your post.

"Well, I went off plans, and that has led to more changes then I expected..."

That should be a T shirt logo for sure when it comes to these planes.

As I continue to plod along through this never ending -7 build I am constantly reminded how many times I took "just a little departure" from the plans and.... 18 steps later... a particular custom task at hand is almost finished. (james cowl, home grown plenum, air intakes, back up electrical, ram air, etc, etc, etc...)

I 2nd Mike's copper pipe super buss bar idea. It works like a charm.

Education via experimentation... thanks for the laugh and build on brother!
__________________
Built 7A flew 700+ hrs - sold
- 7 flying
Reply With Quote
  #4  
Old 08-16-2012, 11:53 AM
bill@fusion4.net's Avatar
bill@fusion4.net bill@fusion4.net is offline
 
Join Date: Feb 2011
Location: Suwanee, GA
Posts: 415
Default Thanks

That is just the idea I needed. Off to HD Aviation on my way home. Don't have to order or wait for anything
__________________
Bill Thomasson
RV-10 - Flying - Phase II. 99.8% done... it's never really done!
http://sites.google.com/a/fusion4.net/rv10/
Suwanee, GA.
Reply With Quote
  #5  
Old 08-16-2012, 02:35 PM
Daniel S. Daniel S. is offline
 
Join Date: Dec 2011
Location: Lawrenceville, Georgia
Posts: 315
Default

Dude. I don't know why I didn't notice this the other day... Turn your Starter solenoid upside-down so you can pull some G's (in turbulance of course) and not inadvertently grind the gears from the starter engaging.
__________________
DANIEL S.
RV7-A (528KS)
-Empannage Done.
-Electrical System Planning / Schematic Done.
-Wing Kit Delivered 09/13/12.
-Wings 95% Done Flaps & Electrical to go.
-Have got to order the fuse soon!!!!.

[/font]http://www.mykitlog.com/dschoning/
"This is a first-time event, and we're looking forward to it"... Chuck Yeager
Reply With Quote
  #6  
Old 08-16-2012, 04:01 PM
gasman gasman is offline
 
Join Date: Mar 2007
Location: Sonoma County
Posts: 3,821
Default

I would agree about the copper coupling....... except use a 2" coupling. It is a lot thicker.
__________________
VAF #897 Warren Moretti
2019 =VAF= Dues PAID
Reply With Quote
  #7  
Old 08-16-2012, 07:08 PM
Captain Avgas Captain Avgas is offline
 
Join Date: Oct 2005
Location: Melbourne, Australia
Posts: 1,866
Default

Quote:
Originally Posted by Daniel S. View Post
Turn your Starter solenoid upside-down
Or, in other words.....turn the starter solenoid up the right way. Unless of course the photo that was posted is upside down.

When it comes to the electrical architecture and associated firewall fittings, some serious time for planning in advance of drilling holes should be allowed. The old adage "haste makes waste" applies to this part of the build in particular.
__________________
You’re only as good as your last landing
Bob Barrow
RV7A
Reply With Quote
  #8  
Old 08-17-2012, 02:03 AM
gasman gasman is offline
 
Join Date: Mar 2007
Location: Sonoma County
Posts: 3,821
Default

Quote:
Originally Posted by Captain Avgas View Post
Or, in other words.....turn the starter solenoid up the right way. Unless of course the photo that was posted is upside down.

When it comes to the electrical architecture and associated firewall fittings, some serious time for planning in advance of drilling holes should be allowed. The old adage "haste makes waste" applies to this part of the build in particular.
Maybe, The fuseable links are also mounted upside down.
__________________
VAF #897 Warren Moretti
2019 =VAF= Dues PAID
Reply With Quote
  #9  
Old 08-17-2012, 06:42 AM
bill@fusion4.net's Avatar
bill@fusion4.net bill@fusion4.net is offline
 
Join Date: Feb 2011
Location: Suwanee, GA
Posts: 415
Default Thanks

Thanks for the critique as well. I knew the fuseable links were in upside down, I had just thrown them on the firewall after I had already 'stopped' work for the night and was just trying to get an idea of where I was going to be working the next day. All of the components shown just have screws pushed through the firewall, but no nuts on them at all. I had not even opened the firewall forward instructions yet. But thanks for all the input. Much better to have 100's of eyes catching things then to grind starter gears and loose alternators because things are not install correct.
__________________
Bill Thomasson
RV-10 - Flying - Phase II. 99.8% done... it's never really done!
http://sites.google.com/a/fusion4.net/rv10/
Suwanee, GA.
Reply With Quote
Reply



Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 07:15 PM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.