I am in rented shop/hangar and will need to move out by August. Based on projected RV4 build time and my weekly shop hours, I will be cutting it close. I am curious if you all can give me some advice on what can be reasonably foregone in order to get the plane inspected/in the air so that I do not have to trailer it out? (I searched VAF on this topic but didn't find anything - please redirect me if this has been answered elsewhere). I will have plenty of free time after the move to sew things up.
Thanks everyone!
Eric
__________________
Eric Stewart
=VAF= dues paid 2016
facebook.com/TheSR1Project
|

01-29-2012, 09:41 AM
|
 |
|
|
Join Date: Mar 2005
Location: Dallas area
Posts: 10,762
|
|
Hard to understand your question. What are you asking?
If your "schedule" says you are cutting it close, my prediction is that you won't make it.
I've been building and inspecting amateur-built aircraft for over 30 years, and rarely, if ever see one finished "on schedule".
__________________
Mel Asberry, DAR since the last century.
EAA Flight Advisor/Tech Counselor, Friend of the RV-1
Recipient of Tony Bingelis Award and Wright Brothers Master Pilot Award
USAF Vet, High School E-LSA Project Mentor.
RV-6 Flying since 1993 (sold)
<rvmel(at)icloud.com>
|

01-29-2012, 10:39 AM
|
|
|
|
Join Date: Nov 2008
Location: Santa Paula CA
Posts: 183
|
|
Hi Mel-
Thanks for your question. To clarify: I have told the owner of the shop I will be out by late summer. I am working full time on the plane, and consistently log 40-50 hours per week. I understand that some RVs are "never done", but based on Van's 2000-2200 hour build time, and that I am sticking to the plans with minimal mods, I feel like I can guess a rough finish date. If avoiding painting, or wheelpants, etc.would move my finish time up even a few weeks, that would be significantly helpful.
Hope that clarifies the question, and thanks for your input.
Eric
__________________
Eric Stewart
=VAF= dues paid 2016
facebook.com/TheSR1Project
|

01-29-2012, 10:47 AM
|
 |
Senior Curmudgeon
|
|
Join Date: Sep 2005
Location: Dayton Airpark, NV A34
Posts: 15,408
|
|
So, what is the current status of the plane???
It is pretty hard to give any answers to your question unless we know if you just opened the shipping crate yesterday, or have it on its wheels, and the engine mounted ----- or somewhere in between.
Photos would be nice
__________________
Mike Starkey
VAF 909
Rv-10, N210LM.
Flying as of 12/4/2010
Phase 1 done, 2/4/2011 
Sold after 240+ wonderful hours of flight.
"Flying the airplane is more important than radioing your plight to a person on the ground incapable of understanding or doing anything about it."
|

01-29-2012, 10:49 AM
|
|
|
|
Join Date: Jan 2005
Posts: 239
|
|
Where are you in the build process?
Quote:
Originally Posted by Stewie
Hi all-
I am in rented shop/hangar and will need to move out by August. Based on projected RV4 build time and my weekly shop hours, I will be cutting it close. I am curious if you all can give me some advice on what can be reasonably foregone in order to get the plane inspected/in the air so that I do not have to trailer it out? (I searched VAF on this topic but didn't find anything - please redirect me if this has been answered elsewhere). I will have plenty of free time after the move to sew things up.
Thanks everyone!
Eric
|
To clearly estimate the time from where you are and when it'll be an RV-4, one would need specifics.
So--- what's done and what needs to be done?
|

01-29-2012, 11:02 AM
|
 |
|
|
Join Date: Aug 2005
Location: Mendon South Carolina
Posts: 1,391
|
|
Quote:
Originally Posted by Mel
Hard to understand your question. What are you asking?
If your "schedule" says you are cutting it close, my prediction is that you won't make it.
I've been building and inspecting amateur-built aircraft for over 30 years, and rarely, if ever see one finished "on schedule".
|
Heed what mel said. Several times I would tell folks I would be ready by S&F or Airventure only to watch the event date slip by and not be finished.
You can't control UPS, FedEX, weather, parts availability , part quality and your own screw ups all areas in which delays are inevitable.
I also would caution against "minimal preparation" or minimal build requirements. Over build, over prepare and give scheduling deadlines the lowest of all priorities.
You probably wouldn't go to a doctor who advertised that he provided "the minimum standard of care" As a DAR I would not approve a plane that had minimal preparation fro my visit and would not fly in one that was a minimal build all for the sake of a schedule.
Whatever your schedule add 6 to 9 months, build it complete, and over prepare for the inspection. If this involves moving a partial project to a new location then build that into your schedule.
You will be rewarded with a well built safe aircraft.
__________________
Milt Concannon
|

01-29-2012, 11:05 AM
|
 |
|
|
Join Date: Mar 2009
Location: Rochester NY
Posts: 669
|
|
For an inspection, the aircraft has to be ready for flight.
Paint, wheel pants, and gear leg fairings are not required to be done.
For the minimum equipment that has to be installed and working, see FAR 91.205. So, for example, if you leave off the strobe lights and the nav lights, that's okay but you obviously can only fly day until such time as the installation of the required equipment.
I can imagine a scenario or two that when you would add equipment or make changes later, you might have to notify the FSDO and put the aircraft back in Phase I for a period of time.
Dan
__________________
RV7A (N7101) - Flying 10/2008
CFI- SE/ME/Inst
A&P
KC2ZEL
|

01-29-2012, 11:14 AM
|
|
|
|
Join Date: Nov 2008
Location: Santa Paula CA
Posts: 183
|
|
Sorry, I don't think I did a good job of posing my question. I'm less interested in estimating remaining build time than in minimizing it so that I can ferry the airplane to my next destination as early as possible.
For what it's worth, I am at 600 hours and finished with the empennage and left wing.I will have a helper later in the build for firewall forward and wiring.
This question came to mind as I was finishing up the wingtip lights. I realized that was something I perhaps could have left until after first flight and saved myself a few days of fiberglass/installation work (I have the old style tips so fabricating/installing lenses took a bit of time.
To word the question another way: what can be left undone until after inspection? What is "bare bones" safe for flight?
Hope that helps. Appreciate everyone's input.
Eric
__________________
Eric Stewart
=VAF= dues paid 2016
facebook.com/TheSR1Project
|

01-29-2012, 11:41 AM
|
 |
|
|
Join Date: Mar 2005
Location: Dallas area
Posts: 10,762
|
|
Personally I would probably refuse to inspect an airplane under these conditions. I've seen too many "hurried" or "minimum to get by" builds. The end result is never a good outcome. Take your time and do it right, even if it means trucking to another airport.
__________________
Mel Asberry, DAR since the last century.
EAA Flight Advisor/Tech Counselor, Friend of the RV-1
Recipient of Tony Bingelis Award and Wright Brothers Master Pilot Award
USAF Vet, High School E-LSA Project Mentor.
RV-6 Flying since 1993 (sold)
<rvmel(at)icloud.com>
|

01-29-2012, 11:53 AM
|
|
|
|
Join Date: Mar 2007
Location: Sonoma County
Posts: 3,821
|
|
Quote:
Originally Posted by Stewie
For what it's worth, I am at 600 hours and finished with the empennage and left wing.I will have a helper later in the build for firewall forward and wiring.
To word the question another way: what can be left undone until after inspection? What is "bare bones" safe for flight?
Hope that helps. Appreciate everyone's input.
Eric
|
Plan on the trailer......... You have at least 2000 hours to go. But only have about 1000 work hours till Aug. 1. Finish the other wing then move before you jig up for the fuselage. Wings are easy to move.
__________________
VAF #897 Warren Moretti
2019 =VAF= Dues PAID
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
All times are GMT -6. The time now is 11:48 PM.
|