VansAirForceForums  
Home > VansAirForceForums

- POSTING RULES
- Donate yearly (please).
- Advertise in here!

- Today's Posts | Insert Pics


Go Back   VAF Forums > Main > RV General Discussion/News
Register FAQ Members List Calendar Today's Posts

Reply
 
Thread Tools Search this Thread Display Modes
  #1  
Old 03-24-2011, 03:44 PM
pmnewlon pmnewlon is offline
 
Join Date: Jun 2010
Location: Columbus, OH
Posts: 113
Default I swear I was just going to update the panel

A little panel rework has become much more than I anticipated. Now I'm doing a bunch of new sheet metal too. At work we call it 'scope creep' - the scope of the original project plan has crept significantly.

I got a good deal on a nice shear in Pontiac, MI. that I just couldn't pass up. I spent yesterday getting the beast off my truck - no forklift or loader at the airport and I wasn't paying $175 to rent a bobcat with forks and a trailer. The heavy-duty car dollies are on sale at Harbor Freight this week.



Reply With Quote
  #2  
Old 03-24-2011, 04:18 PM
Toobuilder's Avatar
Toobuilder Toobuilder is offline
 
Join Date: Jul 2009
Location: Mojave
Posts: 4,643
Default

Quote:
Originally Posted by pmnewlon View Post
A little panel rework has become much more than I anticipated. Now I'm doing a bunch of new sheet metal too...
I feel your pain! My "simple" oil pump AD has gone from a weekend or two to 13 months!
__________________
WARNING! Incorrect design and/or fabrication of aircraft and/or components may result in injury or death. Information presented in this post is based on my own experience - Reader has sole responsibility for determining accuracy or suitability for use.

Michael Robinson
______________
Harmon Rocket II -SDS EFI
RV-8 - SDS CPI
1940 Taylorcraft BL-65
1984 L39C
Reply With Quote
  #3  
Old 03-24-2011, 04:26 PM
9GT's Avatar
9GT 9GT is offline
 
Join Date: Jan 2010
Location: Southern Michigan
Posts: 1,964
Default

Very nice! I used to work in a prototype job shop in the late 70's as a checking fixture builder. These places were just about everywhere back then in the Detroit area. Our standard scheduled work week was 56 hours and the pay was good! Now that just about everything auto related is coming from Mexico and China,,,,,it put a good majority of these places out of business. The shop I worked for ended up selling off their machinery, both metal working and the wood working machinery for the model makers (good stuff) at scrap steel value.
__________________
David C.
Howell, MI
RV-10: #41686 Under Construction
RV-9A: #90949 Under Construction
RV-10: #40637 Completed/Sold 2016
Cozy MKIV:#656 Completed/Sold 2007
"Donor Exempt" but donated through Dec. 2020
Reply With Quote
  #4  
Old 03-24-2011, 08:52 PM
mcencula mcencula is offline
 
Join Date: Jul 2007
Location: Delaware, OH
Posts: 435
Default Nice!

So, umm, yeah, Phil. I'm pretty sure I'm going to need to "test" your shear from time to time.

Congrats on the new acquisition.
__________________
Mike Cencula
RV-7A (fuselage)
www.our7a.com
Betcha my pile-o-scrap is bigger than your pile-o-scrap.
Reply With Quote
  #5  
Old 03-24-2011, 09:43 PM
jetjok's Avatar
jetjok jetjok is offline
 
Join Date: Feb 2007
Location: Sutter Creek, CA
Posts: 842
Default

Quote:
Originally Posted by Toobuilder View Post
I feel your pain! My "simple" oil pump AD has gone from a weekend or two to 13 months!
Mike,
i feel your pain. My -6 was supposed to be a rewire (FWF and cockpit) and new panel job. After a term that I am way too embarrassed to state, it still sits spread all over my hangar.
Phil, nice shear! It is not often (especially for those of us not building) that you need one, but it sure would be nice to have.
__________________
Mark Ohlau
RV-6 N506MM VAF #1410
2017 Donation Made
Reply With Quote
  #6  
Old 03-24-2011, 09:44 PM
L.Adamson's Avatar
L.Adamson L.Adamson is offline
 
Join Date: Apr 2005
Location: KSLC
Posts: 4,021
Default

I thought all RV builders had 3 or 4' shears....

I do...

L.Adamson --- RV6A
Reply With Quote
  #7  
Old 03-24-2011, 10:10 PM
Toobuilder's Avatar
Toobuilder Toobuilder is offline
 
Join Date: Jul 2009
Location: Mojave
Posts: 4,643
Default

Quote:
Originally Posted by jetjok View Post
Mike,
i feel your pain. My -6 was supposed to be a rewire (FWF and cockpit) and new panel job...
Funny, but I ended up with a new panel, even though that was not the original intent. I also redid the fuel system, all new fluid lines FWF, baffles, new ignition, primary wiring, moved antennas, and a bunch of other stuff that "only takes a little more time"...

I think it is a mental disorder...
__________________
WARNING! Incorrect design and/or fabrication of aircraft and/or components may result in injury or death. Information presented in this post is based on my own experience - Reader has sole responsibility for determining accuracy or suitability for use.

Michael Robinson
______________
Harmon Rocket II -SDS EFI
RV-8 - SDS CPI
1940 Taylorcraft BL-65
1984 L39C
Reply With Quote
  #8  
Old 03-25-2011, 01:19 AM
rvmills's Avatar
rvmills rvmills is offline
 
Join Date: Nov 2007
Location: Reno, NV
Posts: 2,125
Default

I had considerable mission creep when doing the panel upgrade a few years ago. Started planning in FEB, took it down for the project in late MAR, planned to git er done by June. Whoosh went the 4th of July...whoosh went OSH...whoosh went the Reno Air Races. Done 7 months later, and with a lot more new parts than originally planned...some in places not even near the panel...but worth it!

I did gain several new tools in the process, but none quite as manly as that shear!

Seems the new tools come with the jobs...or is it the jobs are good excuses to buy the tools we really want. Shhhhhh...did I say that with my outside voice . Don't let my wife in on that...since these are all jobs I'm doing on "the airplane that needed nothing" when I bought it!

Not sure which came first...the jobs or the tools...but I promise I'll never say "it's VAF...I see all that cool stuff, and I just gotta do it to my plane too!"

Definitely a mental disorder!

Cheers,
Bob
__________________
Bob Mills
RV-6 "Rocket Six" N49VM
Reno-Stead, NV (KRTS)
President/Sport 47/49, Sport Class Air Racing
President, Formation Flying Inc (FFI)
Flight Lead, Lightning Formation Airshows
Reply With Quote
  #9  
Old 03-25-2011, 03:48 AM
pmnewlon pmnewlon is offline
 
Join Date: Jun 2010
Location: Columbus, OH
Posts: 113
Default

Quote:
Originally Posted by mcencula View Post
So, umm, yeah, Phil. I'm pretty sure I'm going to need to "test" your shear from time to time.

Congrats on the new acquisition.
C'mon down to F5! It sure is nice to be able to cut a little, fit a little, cut a little more all in one place. I've gotta be careful to leave room for the hangar fridge though.

I'm not the least bit bashful to tell Rosie I need another tool for the job. You should see the handy DeWalt cordless circular saw I got cuz she wanted the TV mounted on the wall!

Last edited by pmnewlon : 03-25-2011 at 03:50 AM.
Reply With Quote
Reply



Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 02:03 AM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.