VansAirForceForums  
Home > VansAirForceForums

- POSTING RULES
- Donate yearly (please).
- Advertise in here!

- Today's Posts | Insert Pics


Go Back   VAF Forums > Main > RV General Discussion/News
Register FAQ Members List Calendar Today's Posts

Reply
 
Thread Tools Search this Thread Display Modes
  #1  
Old 02-05-2010, 10:58 PM
avq avq is offline
 
Join Date: Feb 2010
Location: Melbourne, FL
Posts: 31
Default practice kit question

I am building the aeleron kit and the leading edge is not comming out correctly. After rolling the leading esge and making the lap joint I am having a hard time aligning the top and bottom skin because I did not pre-drill bottom skin. Was I supposed to do this?

Any tips would be appreciated!
Reply With Quote
  #2  
Old 02-05-2010, 11:34 PM
Danny7 Danny7 is offline
 
Join Date: May 2008
Location: central oregon
Posts: 1,089
Default

the directions say to drill after assembly and bending- i seem to remember i riveted the skins on, bent the curved sections to where i liked them and used cleko clamps, on e on each side to hold the position. drilled and tried to debur, then riveted.
__________________
nothing special here...
Reply With Quote
  #3  
Old 02-06-2010, 07:20 AM
skyking902001's Avatar
skyking902001 skyking902001 is offline
 
Join Date: Oct 2009
Location: Gunter, TX
Posts: 314
Default Practice Kit

I riveted the entire assembly together, including trailing edge. Last step was to roll the leading edge and pop rivet it together. Here is a pic before I finished the remaining rivets--final step is to roll the front. Good luck with your project.

Sky
8/8A?
Reply With Quote
  #4  
Old 02-06-2010, 07:52 AM
Capflyer's Avatar
Capflyer Capflyer is offline
 
Join Date: Feb 2005
Posts: 1,082
Default

Try rolling the leading edges of each side individually before riveting them to the ribs. It will be much easier doing it that way. Then cleco them on the ribs and spar, cleco clamp the ends of the leading edge, then match drill the holes. To be sure you align the matched holes your will be drilling through one leading edge into the other, do a dry fit and mark through one of the end holes where it should be since the plans give no specific dimension. Measure this from the edge and draw a line all the way down so it is parallel to the front edge of the skin. This way when you go to match drill you will see that line through the holes which will keep it perfectly aligned.
__________________
Mike
JAMES AIRCRAFT.com

Flying - RV8 Hot Rod "Drone Killer"
Flying - RV8 "Look'n Good"
RV4 - FAST & FUN! Rebuilt, Flown, Sold
RV-7A Built, Flown, Sold

Last edited by Capflyer : 02-06-2010 at 08:01 AM.
Reply With Quote
Reply



Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 01:41 AM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.