Relay - What Kind, and Will This Work?
All right all you electrical smarties, I know someone knows the answer to this.
I want automatic fuel transfer from an aux tank. Float switches will not handle enough current to power the pump, which means one or more relays. I don't want the pump turning on and off every time fuel sloshes, so I need to be smarter than the fuel (difficult on some days). Finally, I do not want the relay coils to have to be continually nor intermittently (due to sloshing) energized (that's a bad thing, isn't it?) when using a latching relay to avoid burning out the coils.
Here is what I imagine might work:
Questions:
Will this work, or will the current to the coil be interrupted before it develops sufficient momentum to complete the state change?
What kind of relay do I need - is this a SPDT or a DPST latching-type relay?
Has anyone already done something like this, and would you share your solution?
Many thanks!
|

11-11-2009, 12:56 PM
|
|
|
|
Join Date: Dec 2006
Location: Atlanta, GA
Posts: 1,231
|
|
I may have already answered part of my own question.
If I reverse the polarities and have the relay control positive rather than ground, I could include a small capacitor between the relay and float switches so that when the float switch activates it continues to power the alternate-side coil for a moment after the now inactive relay side breaks contact, thus assuring enough of a "push" to get the relay all the way over.
Is this correct, and is it even necessary? If so, what size capacitor should I plan on using?
I somewhat prefer having the float switches only provide a ground path...
|

11-11-2009, 01:03 PM
|
 |
|
|
Join Date: Jan 2007
Location: Battleground
Posts: 4,348
|
|
Try a programmable relay?
There are many excellent choices in industrial control progammable relays. Try Potter Brumfeld. You can program the outputs with any kind of time delay or interval you need.
It is pretty amazing what you can buy for under $100.
__________________
Smart People do Stupid things all the time. I know, I've seen me do'em.
RV6 - Builder/Flying
Bucker Jungmann
Fiat G.46 -(restoration in progress, if I have enough life left in me)
RV1 - Proud Pilot.
|

11-11-2009, 02:01 PM
|
|
|
|
Join Date: Dec 2006
Location: Atlanta, GA
Posts: 1,231
|
|
Ok, so Potter & Brumfield is a brand. I was using the DigiKey search tool trying to locate what I want, but the problem is I don't know what it would be called.
For instance, under P&B there are Magnetic Latching and Mechanical Latching. Which to choose, or neither?
A 12v SPDT latching relay controlling up to 5amps is only $3.50, so if the circuit I drew (or that circuit plus some small mod) works that would probably be fine - I do intend to keep circuit options which are "Hard ON" and "Hard OFF" if the relay fails...
|

11-11-2009, 02:21 PM
|
 |
|
|
Join Date: Jan 2007
Location: Battleground
Posts: 4,348
|
|
There is no such thing as Hard on or Off.
Quote:
Originally Posted by breister
Ok, so Potter & Brumfield is a brand. I was using the DigiKey search tool trying to locate what I want, but the problem is I don't know what it would be called.
For instance, under P&B there are Magnetic Latching and Mechanical Latching. Which to choose, or neither?
A 12v SPDT latching relay controlling up to 5amps is only $3.50, so if the circuit I drew (or that circuit plus some small mod) works that would probably be fine - I do intend to keep circuit options which are "Hard ON" and "Hard OFF" if the relay fails...
|
Even a latched relay can fail. Most systems I have seen are manually operated and rely on the pilot to manage his fuel.
If you are dead set on an automatic system, search the P&B website directly for a "programmable" relay. They make all types that can be readily programmed via dip switch settings to make up whatever logic you need. Good luck.
__________________
Smart People do Stupid things all the time. I know, I've seen me do'em.
RV6 - Builder/Flying
Bucker Jungmann
Fiat G.46 -(restoration in progress, if I have enough life left in me)
RV1 - Proud Pilot.
|

11-11-2009, 02:32 PM
|
|
|
|
Join Date: Dec 2006
Location: Atlanta, GA
Posts: 1,231
|
|
Had to read a bunch of PDFs, but finally concluded that they have renamed "Programmable" to "Multifunction."
You are correct, latching relays are less reliable - what I now think will be simpler will be a timing function called "Interval Off" (meaning that the timer will commence once voltage is released, allowing me to use my mid-level float in a "fuller is closed, emptier is open" configuration that can also provide an indicator light telling me I have "at least" mid-level fuel in the receiving tank. Setting the interval for a couple of minutes should be enough that I don't wear out the pump once I'm out of fuel, negating the need for a separate "kill the power if transfer tank is empty" sensor.
Now all I need to do is order one and decipher the wiring diagram...
Thanks!

|

11-11-2009, 03:00 PM
|
 |
|
|
Join Date: Apr 2008
Location: California
Posts: 652
|
|
Enable/Disable
You might consider a switch in there that will enable or disable the auto transfer.
Don
|

11-11-2009, 03:10 PM
|
|
|
|
Join Date: Dec 2006
Location: Atlanta, GA
Posts: 1,231
|
|
Yep, will have 3-way switch "On-Off-Auto."
Thanks all!
|

11-11-2009, 03:15 PM
|
 |
|
|
Join Date: Jan 2007
Location: Battleground
Posts: 4,348
|
|
A little off your topic, but it might apply here...
...a fellow I know ferried a DC3 across the pond. They added a large internal tank and cross over system and a pump to allow the continual pumping of fuel out of the ferry tank while they where flying off the mains. At some point they noticed that the fuel level was falling until they realized they plumbed the pump backwards. They did a mid air reconfiguration of the pump however, with the time lost, the pump was not going to be able to keep up with the fuel flow of the engines. They feared they would run out of fuel with fuel still in the ferry tank unable to pump it out fast enough. They made it but it was a heroing experience.
I am not familiar with DC3's fuel systems and this story comes from memory so take it with a grain or two. Bottom line....
Make sure your pump can keep up with your fuel flow!
__________________
Smart People do Stupid things all the time. I know, I've seen me do'em.
RV6 - Builder/Flying
Bucker Jungmann
Fiat G.46 -(restoration in progress, if I have enough life left in me)
RV1 - Proud Pilot.
|

11-11-2009, 03:32 PM
|
 |
|
|
Join Date: Jan 2006
Location: Green Bay, WI (GRB)
Posts: 476
|
|
12 VDC PLC
Quote:
Originally Posted by JonJay
There are many excellent choices in industrial control progammable relays. Try Potter Brumfeld. You can program the outputs with any kind of time delay or interval you need.
It is pretty amazing what you can buy for under $100.
|
http://factorymation.info/plr/fmcat_sg2_specs.pdf
I have used this PLC in a 120VAC model, they have recently released a 12VDC version. With the correct programing and sensors this device could be used to control a number of functions in the RV.
VFE control of the flaps
Wig Wag lights
Starter lockout, etc.
__________________
Don Pansier
Green Bay, WI (GRB)
RV-7 N450DP
W9LYX
Antennas for Experimental Aircraft
www.deltapopaviation.com
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
All times are GMT -6. The time now is 07:13 PM.
|