Re-bar, or most any form of steel rod of adequate size. Re-bar rusts, so if you are in a wet place---------
Bend into a "U" shape, flare the tips out a bit, for additional holding strength.
Get some cheap stainless salad bowls, couple holes in the bottom for the rods, set the whole mess into the wet concrete.
I would suggest digging out a little deeper in the area of the tie downs, maybe a foot square and eight inched deep, just to give the slab more local strength. Also gives the legs of the hold down somewhere to go.
Good luck.
__________________
Mike Starkey
VAF 909
Rv-10, N210LM.
Flying as of 12/4/2010
Phase 1 done, 2/4/2011

Sold after 240+ wonderful hours of flight.
"Flying the airplane is more important than radioing your plight to a person on the ground incapable of understanding or doing anything about it."