Another update on this topic ...
I wired the LSE power yesterday. Although I still need to wire in an inline fuse at the battery end, the rest of the shielded wire is in place to the 5A CB, the toggle switch and the LSE unit. I jumped the shield around each component.
However, on the advice of many, I think I'll use the airframe ground initially. It will always be a ground, despite master being off in an emergency situation. However, if I end up with noise, I can always just rewire it back to the battery.
Thanks for all of the help, guys.
__________________
Don McNamara
Peoria, AZ
Builder: RV-8 "Smokey"
|