|
-
POSTING RULES

-
Donate yearly (please).
-
Advertise in here!
-
Today's Posts
|
Insert Pics
|

11-29-2007, 11:45 AM
|
 |
Senior Curmudgeon
|
|
Join Date: Sep 2005
Location: Dayton Airpark, NV A34
Posts: 15,408
|
|
Smoke testing
O.K., so I am very close to firing up my panel. I have put a bit of thought into the way/method of testing the package, and would like input from the "VAF database" as to my ideas.
My plane has a dual battery, dual alternator system, the radios and the EFISs are powered directly from the aux batt, all else directly from the main batt.
The main batt feeds the aux buss through a 35 amp Schottky diode, in case the aux system goes south on me.
My plan is to pull all the circuit breakers, turn off all the electronics that have off switches, and fire up the aux power. I will then energize one circuit at a time, starting with the least important one on the aux buss, then if no issues, pull that breaker, and move on to the next one until all aux system circuits have been tested.
Repete same for the main.
Then go back to the aux and energize circuits one at a time, and adding circuits until all aux breakers are in.
Again, repete for the main.
Obviously, this assumes no smoke escaping------or at least fixing anything that comes up at each stage.
Anybody out there see any issues with this??????
Thanks in advance,
__________________
Mike Starkey
VAF 909
Rv-10, N210LM.
Flying as of 12/4/2010
Phase 1 done, 2/4/2011 
Sold after 240+ wonderful hours of flight.
"Flying the airplane is more important than radioing your plight to a person on the ground incapable of understanding or doing anything about it."
|

11-29-2007, 01:31 PM
|
 |
|
|
Join Date: Oct 2006
Location: Garden City, Tx
Posts: 5,120
|
|
Would be nice to have a total ammeter reading for each buss - so you can watch the draw increase as you add items. This will give you a first indication of something "not quite right", hopefully before smoke evolution begins.
__________________
Greg Niehues - SEL, IFR, Repairman Cert.
Garden City, TX VAF 2020 dues paid 
N16GN flying 700 hrs and counting; IO360, SDS, WWRV200, Dynon HDX, 430W
Built an off-plan RV9A with too much fuel and too much HP. Should drop dead any minute now.
|

11-29-2007, 01:45 PM
|
 |
Senior Curmudgeon
|
|
Join Date: Sep 2005
Location: Dayton Airpark, NV A34
Posts: 15,408
|
|
Greg---------great idea. I never thought of that.
This is one reason why I love this site, the resource and information available is incredible.
Anyone else??
__________________
Mike Starkey
VAF 909
Rv-10, N210LM.
Flying as of 12/4/2010
Phase 1 done, 2/4/2011 
Sold after 240+ wonderful hours of flight.
"Flying the airplane is more important than radioing your plight to a person on the ground incapable of understanding or doing anything about it."
|

11-29-2007, 10:33 PM
|
 |
VAF Moderator / Line Boy
|
|
Join Date: Jan 2005
Location: Dayton, NV
Posts: 12,245
|
|
Mike - looks like a good plan to me - very much like how we bring an Orbiter to life - start with everything out, then add them individually. If you smell smoke, you should have a good idea who(what) did it!
If you REALLY want to emulate the big boys, build a detailed 100 page checklist for the test, and after each addition, list the ammeter and voltmeter readings, you then can put that big data book on the shelf, and never look at it again....
Good luck!
Paul
__________________
Paul F. Dye
Editor at Large - KITPLANES Magazine
RV-8 - N188PD - "Valkyrie"
RV-6 (By Marriage) - N164MS - "Mikey"
RV-3B - N13PL - "Tsamsiyu"
A&P, EAA Tech Counselor/Flight Advisor
Dayton Valley Airpark (A34)
http://Ironflight.com
|

11-29-2007, 11:44 PM
|
 |
Senior Curmudgeon
|
|
Join Date: Sep 2005
Location: Dayton Airpark, NV A34
Posts: 15,408
|
|
Paul, thanks for the comments. Looks like I am on the right track.
180 hits, only one suggestion. I am a bit amazed, figured I would have gotten more input-----(read that as I missed things in my procedure.)
Is it really that simple???
__________________
Mike Starkey
VAF 909
Rv-10, N210LM.
Flying as of 12/4/2010
Phase 1 done, 2/4/2011 
Sold after 240+ wonderful hours of flight.
"Flying the airplane is more important than radioing your plight to a person on the ground incapable of understanding or doing anything about it."
|

11-30-2007, 07:12 AM
|
 |
|
|
Join Date: Jan 2006
Location: South Africa
Posts: 840
|
|
Mike,
I do not want to complicate matters, but here is my 2C.
If you can find it I found a bench power supply with an adjustable current limit invaluable. Do as you have mentioned and adjust the current limit to the minimum for the particular item you are switching on. this will ensure the minimum or no damage if there is a short or something. In other words - it will keep all the smoke where it belongs. 
Jan - South Africa.
7A flying and another 7A in process.
|

11-30-2007, 09:08 AM
|
 |
Senior Curmudgeon
|
|
Join Date: Sep 2005
Location: Dayton Airpark, NV A34
Posts: 15,408
|
|
Jan, another good idea.
Thanks.
As things are, my aux power is run through an automotive style fuse------I can just change out fuses to limit each step of the test. Not as sophisticated as what you are suggesting, but simpler and cheaper to get virtually the same result.
And I can easily wire in a test fuse into my main power for testing the main buss stuff.
Appreciate the input.
__________________
Mike Starkey
VAF 909
Rv-10, N210LM.
Flying as of 12/4/2010
Phase 1 done, 2/4/2011 
Sold after 240+ wonderful hours of flight.
"Flying the airplane is more important than radioing your plight to a person on the ground incapable of understanding or doing anything about it."
|

01-15-2008, 06:58 PM
|
 |
Senior Curmudgeon
|
|
Join Date: Sep 2005
Location: Dayton Airpark, NV A34
Posts: 15,408
|
|
Yippie!!!!!!!!
Well, after close to 6 weeks of finishing up the rest of the wiring, stalling, procrastinating, finding excuses, Christmas, colds/flu, helping a buddy with a home electrical problem, and a few other legitimate and not so legitimate reasons, and just plain trying to build up my nerve, I finally put the fuse back in the main power lead, and hit the switch.
Nothing happened, so I pushed in a breaker, and another and another and another until---------small boxes of electrons lit up, and ----------------
The smoke stayed in.
As my shirt says, "its five o'clock somewhere". I am going to go mix me a drink.
Glad this is behind me.
__________________
Mike Starkey
VAF 909
Rv-10, N210LM.
Flying as of 12/4/2010
Phase 1 done, 2/4/2011 
Sold after 240+ wonderful hours of flight.
"Flying the airplane is more important than radioing your plight to a person on the ground incapable of understanding or doing anything about it."
|

01-15-2008, 07:34 PM
|
 |
|
|
Join Date: Apr 2006
Location: south carolina
Posts: 1,111
|
|
was'nt it that knowledge
Quote:
Originally Posted by Ironflight
If you REALLY want to emulate the big boys, build a detailed 100 page checklist for the test, and after each addition, list the ammeter and voltmeter readings, you then can put that big data book on the shelf, and never look at it again....
Good luck!
Paul
|
that saved the apollo 13 crew?
__________________
William Weesner/ still kicking.
Last edited by cytoxin : 01-15-2008 at 07:36 PM.
|

01-15-2008, 07:36 PM
|
|
|
|
Join Date: Oct 2005
Location: Savannah, GA
Posts: 1,849
|
|
Congrats on the panel. We didn't know how much work was involved until we got the bill!
You also have a good shirt!
__________________
Todd
N110TD
RV-10 Vesta V8 LS2/BMA EFIS/One formerly flying at 3J1 Hobbs stopped at 150 hours
Savannah, GA and Ridgeland, SC
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
All times are GMT -6. The time now is 06:53 PM.
|