VansAirForceForums  
Home > VansAirForceForums

- POSTING RULES
- Donate yearly (please).
- Advertise in here!

- Today's Posts | Insert Pics


Go Back   VAF Forums > Avionics / Interiors / Fiberglass > Electrical Systems
Register FAQ Members List Calendar Today's Posts

Reply
 
Thread Tools Search this Thread Display Modes
  #1  
Old 10-28-2007, 04:11 PM
uk_figs's Avatar
uk_figs uk_figs is offline
 
Join Date: Jan 2005
Location: Tulsa, OK
Posts: 1,014
Default Multi function switch wiring

I am wiring the switches for nav/strobes and wig wag/landing using the 2-10 DPDT switches from B&C and the diagrams from the aeroelectric book (switch section). Best I can figure out the switches do not seem to work as I am interpreting the diagram. Based on the switch drawing and terminal numbering in the book I think a 2-10 should give the following closed connections:
(keyway up)
Down
2-3 closed
5-6 closed
Middle
1-2 closed
5-6 still closed
up
1-2 closed
4-5 closed
In the case of the Nav/Strobe circuit with the Nav power on terminal 2 and the lights on terminal 1 and the strobe power on terminal 5 with the lights on terminal 4 this should give the following actions:
Down
Lights Off
Middle
Nav lights on (1-2 closed)
Up
Nav and Strobes on (1-2 closed and 4-5 closed)

The switches I have (both marked 2-10) work as follows:
Down
2-3 closed
5-6 closed
Middle
2-3 still closed
4-5 closed
Up
1-2 closed
4-5 still closed

It does not seem that this will make the lights work as drawn in the schematics if I wire the terminals per the drawings, I can figure out the nav/strobes but as I do not know how the flasher/diode circuit works I do not know how to change the wig wag/landing wiring to suite the switch. I also noted on the Z11 that the fuel boost pump and primer solenoid appear to be reversed the way the 2-50 switch I received works.
Can someone tell me what I am missing, am I interpreting the switch diagrams incorrectly?
Thanks
__________________
Dave (Figs) (RV-7 N256F, Flying)
Dave's RV-7 Blog
Email me
Reply With Quote
  #2  
Old 10-28-2007, 06:24 PM
az_gila's Avatar
az_gila az_gila is offline
 
Join Date: Jan 2005
Location: 57AZ - NW Tucson area
Posts: 10,011
Exclamation Data Sheet

Dave ... the data sheet is linked from AeroElectric Bob's web site...

http://www.aeroelectric.com/Mfgr_Dat.../tl_series.pdf

gil A
__________________
Gil Alexander
EAA Technical Counselor, Airframe Mechanic
Half completed RV-10 QB purchased
RV-6A N61GX - finally flying
Grumman Tiger N12GA - flying
La Cholla Airpark (57AZ) Tucson AZ
Reply With Quote
  #3  
Old 10-28-2007, 06:39 PM
DGlaeser DGlaeser is offline
 
Join Date: May 2005
Location: Rochester Hills, MI
Posts: 878
Default Contacts are 'switched'

It seems to me that if you switch the labels on 1 and 3, as well as 4 and 6, then things work as expected.
I remember reading on the AeroElectric list a while back that depending on who manufactured the switch, the numbering of the terminals was sometimes reversed from what is shown in his book.
__________________
Dennis Glaeser CFII
Rochester Hills, MI
RV-7A - Eggenfellner H6, GRT Sport ES, EIS4000, 300XL, SL30, TT Gemini, PMA6000, AK950L, GT320,
uAvionixEcho ADSB in/out with GRT Safe Fly GPS
Reply With Quote
  #4  
Old 10-28-2007, 08:22 PM
uk_figs's Avatar
uk_figs uk_figs is offline
 
Join Date: Jan 2005
Location: Tulsa, OK
Posts: 1,014
Default different labels

I checked Randy Pflanzer's F1 rocket power distribution drawing and his labels for the S700 series switches are reversed from the aero electric book, if I transpose these the switch functionality works as expected, guess I have to renumber my terminals on my drawings.
__________________
Dave (Figs) (RV-7 N256F, Flying)
Dave's RV-7 Blog
Email me
Reply With Quote
Reply



Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 06:53 PM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.