|
-
POSTING RULES

-
Donate yearly (please).
-
Advertise in here!
-
Today's Posts
|
Insert Pics
|

10-02-2007, 01:49 PM
|
|
|
|
Join Date: Sep 2007
Location: Southern Vermont
Posts: 2
|
|
Bucking rivets.... how much help needed?
I plan to buld the RV-10QB mostly by myself. Is this a mistake? When building the RV-10QB, how much of the riveting will require assistance from another person? Are two people required only occasionally for specific rivets where arms won't reach to both sides at once?... or are two people needed often during the build? I have built cars and boats, owned and worked on aircraft a bit, but I have never done this kind of riveting.
|

10-02-2007, 03:37 PM
|
|
|
|
Join Date: Oct 2007
Location: East Texas
Posts: 26
|
|
Tom, good question. I am in the RV-10 planning stage. As I will be working mostly alone, I have the same thought. I did email a QB builder a while back and he said that he mostly worked alone and only had to have help at a few stages of construction. At the time, he had received the fuselage and wings and had attached the tailcone to the fuselage. I, too, will be interested and reading the member's response.
This month I will get to fly in an RV-10, which will be the last step to seal the decision to build. If all goes well, I will order at Sun n Fun. I have started clearing my shop and setting it up for A/C building.
JF
|

10-02-2007, 04:05 PM
|
|
|
|
Join Date: Aug 2006
Location: Prairieville, LA
Posts: 118
|
|
Bucking Rivets
I have been building a standard build and just joined the tailcone to the fuse. 85% of the riveting in the entire project I would have been able to by myself. Fortunately I had help. I don't see where building a QB by yourself would be an issue, as long as you have help for the occasions that you need. Hopefully, one of the QB guys will chime in as they can speak about it better than myself.
Eric Kallio
40518 baggage floors
|

10-02-2007, 05:09 PM
|
|
|
|
Join Date: Apr 2006
Location: midwest city OK
Posts: 26
|
|
I have completed all of the riveting on a SB fuse, with the exception of the top skin at the back of the tailcone. I have done all the riveting alone, with the exception of joining the 2 halves of the fuse, joining the tailcone to the fuse, and some of the rivets in the front and seams at the bottom of the sides.
My wife has spend 4-6 hours helping to get these areas completed. (do not trade away a spouse which will buck rivets)
Eric Gohr
__________________
Eric Gohr
40271
N410EG
|

10-02-2007, 06:51 PM
|
 |
|
|
Join Date: Apr 2006
Location: south carolina
Posts: 1,111
|
|
got steel?
ive made several bucking bars to aid in the solo builder project. the first one that comes to mind is an 18"x1.5"x3" steel bar. i lay it on several rivets and shoot from under neath. skinned the wing bottoms solo with the help from a roll of duct tape. it can be done with little help. fairly easy. your skills sound similar to mine so i'd say go for it.
__________________
William Weesner/ still kicking.
|

10-02-2007, 07:27 PM
|
|
|
|
Join Date: Oct 2005
Location: Savannah, GA
Posts: 1,849
|
|
A lot of the riveting depends on how long your arms are! I did a lot of the tail myself. Did the tanks and leading edges by myself. But I had help on the wing skins. My daughter age 13 at the time, helped me with the top skins of the wing. My building partner did a lot of the fuselage himself. But there are some areas where you just need two people. Ours is a slow build so I don't know how much is done for you.
__________________
Todd
N110TD
RV-10 Vesta V8 LS2/BMA EFIS/One formerly flying at 3J1 Hobbs stopped at 150 hours
Savannah, GA and Ridgeland, SC
|

10-02-2007, 07:33 PM
|
|
|
|
Join Date: Aug 2005
Location: Atlanta, GA
Posts: 4,208
|
|
On my -6, I suspect I needed 20-30 man-hours of help to rivet the main skins. That wasn't much, considering the scope of the project.
A -10 would probably require more (1/3?), but without counting rivets, that's just a WAG.
__________________
Kyle Boatright
Marietta, GA
2001 RV-6 N46KB
2019(?) RV-10
|

10-02-2007, 08:49 PM
|
|
|
|
Join Date: Jan 2006
Posts: 52
|
|
Solo Building
I have pretty much finished the tin bashing on my slow build - only need to attach the upper fwd fuse. I have rivetted almost all of the airframe solo with excellent results - but the extra care required comes at some expense in time.
One observation tho'. I have found that back rivetting has produced the best looking rivets by far. Although I shot the bottom wing skins solo, I back rivetted the top with a partner and the results are awesome. Unfortunately, I did not have access to a partner when shooting the fuse side skins and so shot normally. I'm very happy with the result, but back rivetting would have been better.
Solo work is certainly possible, but it does take more care and therefore takes longer.
cheers,
Ron
187 finishing
|

10-04-2007, 03:31 PM
|
 |
|
|
Join Date: Aug 2007
Location: Zuerich, Switzerland
Posts: 144
|
|
Building alone
Hi Tom,
I am building a -10 alone in Switzerland. I needed help three times so far.
1 Riveting the tailcone to the fuselage
2 Riveting the frward top tailcone skin to the cabin top
3 Riveting 12 rivets at the wing spar doubler
You definately want a workshop crane. I put my -10 on the wheels and hung the engine with it.
Check out my website http://www.wellenzohn.net
Michael
__________________
RV-10 builder (flying)
#40511
Switzerland
Osh?18 OWW volunteer
Countries HB-YNN has visited:
🇨🇭 Switzerland, 🇩🇪 Germany, 🇦🇹 Austria, 🇮🇹 Italy, 🇭🇷 Croatia, 🇫🇷 France, 🇪🇸 Spain, 🇵🇹 Portugal, 🇸🇮 Slovenia, 🇭🇺 Hungary, 🇷🇴 Romania, 🇷🇸 Serbia,
🇨🇿 Czech Republic
www.wellenzohn.net
First flight Video: https://youtu.be/X7EQ81C3xSA
|

10-05-2007, 08:40 PM
|
 |
|
|
Join Date: Feb 2006
Location: Peachtree City, Georgia
Posts: 440
|
|
Tom,
It took me about 500 hours as a first time builder to finish the Empennage plans and start on the wings. My wife contributed 25.5 hours and that was 100% on riveting the skins. Couldn't have done it without her, but it was my first time. Maybe a few I could have done on my own due to experience. Lifting is another issue. The pieces aren't that heavy, but I needed her to hold the other end. I wish the heads on blind rivets looked a little better....
John
__________________
John Goodman - 40572
First flight was 25 June, 2011
N711JG
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Linear Mode
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
All times are GMT -6. The time now is 01:34 PM.
|