build time
Has anyone ever solicited data on actual build time (hours worked, not calendar time) on the 7? I know what Van's advertises, and I've checked as many web sites as I could find. Some total it up and others don't. Seems like this would be a good idea for one of the polls. If it's been done, I apologize, but I couldn't find it. I have a friend that says it can't be done in under 2000 hours, QB or no QB. I've seen several builders that say it took much less than that. I know that it will vary a lot depending on panel choices, self-painting etc. However, it would be very useful to have a representative sample from the community.
B. Asay
|

09-24-2007, 06:09 PM
|
 |
|
|
Join Date: Jan 2005
Location: Shellmans Bluff, GA
Posts: 517
|
|
1200 hrs.
My 9A QB was completed in 1200 hours over 3 years. That's hours working on the airframe, and firewall forward. Everything except the panel which was done by an avionics shop. I also had mine painted. I didn't log time reading plans and studying other websites, and re-reading plans. I honestly think that would have added another 800 hours. It seems that people log hours differently, some clock in and out of their shop, others estimate after completing a component, others log reading plans along with building hours. I summed up my hands on hours after each work session.
I think a poll would be interesting, but not sure if each would be apples to apples. take care. Jack
__________________
RV9A N489JE - Flying
Eagle Neck Airpark
Shellmans Bluff, Georgia
Last edited by Build9A : 09-24-2007 at 06:11 PM.
Reason: forgot to add paint.
|

09-24-2007, 06:37 PM
|
 |
|
|
Join Date: Mar 2006
Location: Tucson, AZ
Posts: 823
|
|
1316 and counting
Starting in June of 2006, we have 1316 hours working almost every day (4-6 hours). I estimate we have one month left till we're ready for airworthiness.
RV9A QB, QB wings, we assembled the Superior engine in 5 days, made our own panel, and we did all of the wiring (panel too).
What's left? Riveting wings & skin over panel, paint (yes, we're gonna do that too).
It's good to be a TYPE A.
Did I log every phone call, website review, reading, and discussion?
Not a chance. I would guess we will do the next 9A in half the time.
Barry
|

09-24-2007, 08:04 PM
|
|
|
|
Join Date: Jan 2005
Posts: 3,642
|
|
Really depends on whether or not you've built before and how much you know.
I try to log only actual building hours... i.e. not any of the "thinking" time which would probably make my total double the number it is. If I built again I could cut down very significantly on the "think" time, and maybe 20% on the build time, but probably not a whole lot more on the latter. In other words, I could get it done in far less calendar time, but probably not much in actual hours of building.
That said, I'm up to about 1500 hours so far (again, actual building time) and I'm getting close to finishing the canopy which means that the airframe is basically done, except for the cowling. Yep, that's just airframe. I don't even want to know how many more hours for wiring and firewall forward, and painting, but I'd predict another 1000 hours since I know very little about those subjects. FWIW, I got to QB stage with about 1000 hours (less 170 hours for the empennage=830 hours).
Hope this helps with your decision (?)
__________________
Steve M.
Ellensburg WA
RV-9 Flying, 0-320, Catto
Donation reminder: Jan. 2021
|

09-24-2007, 08:25 PM
|
 |
|
|
Join Date: Mar 2005
Location: ...
Posts: 2,049
|
|
Quote:
Originally Posted by alpinelakespilot2000
Really depends on whether or not you've built before and how much you know.
|
It also depends on how close to "stock" you stick. My RV-7 took 2060 hours to build. Things that added quite a bit of build time:
- at the time there was no "kit" for AFP injection on a horizontal sump
- extended instrument panel
- access panels in the front deck
- glassing/filling all the gaps in the emp tips
- left-hand throttle quadrant
- custom filtered air box w/ram air inlet (that was a biggie)
- etc.
All this stuff added considerable build time for me as a first time builder. Had I just stuck to the program I bet I would have been done around 1700 hours. Don't get me wrong, I have NO REGRETS! With such a huge investment you gotta do it your way.
Oh, my RV-7 emp wasn't fully match-drilled either. Elevator skins had no holes, for example. I had to jig all tail surfaces. I probably would have saved several hours if my emp kit looked like the contemporary emp kits do.
Ask around and you'll find that folks are building QB RV-7s in 1400 hours. Jack Lockamy comes to mind...I don't even think he spent that much time.
My hangarmate built a slow build RV-7A in a year and a half. I don't know precisely how many hours he put into it, but I'm pretty sure it was well shy of 2000.
__________________
Dan Checkoway RV-7
Last edited by dan : 09-24-2007 at 08:32 PM.
|

09-25-2007, 06:24 AM
|
|
|
|
Join Date: Oct 2005
Location: Melbourne, Australia
Posts: 1,865
|
|
Quote:
Originally Posted by Blaine Asay
Has anyone ever solicited data on actual build time (hours worked, not calendar time) on the 7? I know what Van's advertises, and I've checked as many web sites as I could find. Some total it up and others don't. B. Asay
|
Dear Blaine, build hours are absolutely meaningless unless you are in a position to judge the quality of the workmanship in each instance.
The bottom line is that quality construction takes time.
The fact that there is a broad spectrum of build times reported simply means that there are significant differences in the build quality.
__________________
You’re only as good as your last landing 
Bob Barrow
RV7A
|

09-25-2007, 08:42 AM
|
 |
|
|
Join Date: Mar 2006
Location: Tucson, AZ
Posts: 823
|
|
Time is a function of experience
Quote:
Originally Posted by Captain Avgas
Dear Blaine, build hours are absolutely meaningless unless you are in a position to judge the quality of the workmanship in each instance.
The bottom line is that quality construction takes time.
The fact that there is a broad spectrum of build times reported simply means that there are significant differences in the build quality.
|
Bob,
Sure, if you want quality, one must take his time but the level of familiarity with the tools that are unique to airplane building, the medium (aluminum), and the differences amongst the assembly elements (AN bolts and rivets) that go into a build increases as you go along.
Speaking for myself, I have built countless cars, two houses, and can, generally speaking, fix anything except a broken heart.
But when it came to an air box, I spent 3 weeks before I got it right. On the next airplane the same air box would be done in 3 days and would be of superior quality.
My advise to someone starting out is to work alongside someone who has done it before and listen to the tips and suggestions. W/o Gil Alexander and other experts nearby, I doubt we'd be this far along after 1300 hours. Work on scrap and practice bucking and riveting before working on the plane. Spend endless hours on the internet watching how others did it before wasting time and $$.
The learning curve is no longer a vertical line on plane # 2. Therefore, the time is markedly decreased.
Barry
|

09-25-2007, 10:08 AM
|
 |
|
|
Join Date: Jan 2006
Posts: 934
|
|
And I suspect it doesn't matter what the first airplane is. If it's some sort of RV, all the better, but I found just having building experience of any type helps tremendously. My first was wood/ fabric and the experience gained from that 7 year project really improves the mental game for the 2nd. Sure, there's different construction skills to be learned, but the mind games a project plays are all the same! Right now, I'm figuring my -7 SB is going to finish in around 1500 hours.
Jim
|

09-25-2007, 12:04 PM
|
 |
VAF Moderator / Line Boy
|
|
Join Date: Jan 2005
Location: Dayton, NV
Posts: 12,243
|
|
Previous experience really comes in a lot of flavors, and really does help! I had never "built" an airplane before I did my -8 (in 1040 hours of total "contact time"), but I was re-building J-3 Cubs when I was a kid, and maintained my own Grumman for a couple decades (under the supervision of my friendly A&P/IA). Firewall Forward on the -8 is virtually identical to a Grumman - at least on mine - and it took me maybe a week to have it done (except for the #$%@^ baffles of course...). Everyone takes more time on the tasks they have to learn from scratch, and breezes through those things that are old hat.
In the end, no one else can really predict how long it will take YOU to build YOUR plane - there are just too many variables!
Paul
__________________
Paul F. Dye
Editor at Large - KITPLANES Magazine
RV-8 - N188PD - "Valkyrie"
RV-6 (By Marriage) - N164MS - "Mikey"
RV-3B - N13PL - "Tsamsiyu"
A&P, EAA Tech Counselor/Flight Advisor
Dayton Valley Airpark (A34)
http://Ironflight.com
Last edited by Ironflight : 09-25-2007 at 06:58 PM.
|

09-25-2007, 01:18 PM
|
 |
|
|
Join Date: Jan 2005
Location: Tulsa, OK
Posts: 1,014
|
|
Build hours
I have tried to keep track of actual time spent building in my garage and there is a link to the hours page on my blog http://ukfigs.blogspot.com which will give just one perspective. This log does not count many many hours on other builders and manufacturers web sites and this forum researching the various options at each phase. I have saved some time with QB tanks and a QB fuselage, and I think my choice of glass cockpit with pre built harnesses will also save some time.
So far I am at 3 years elapsed time and estimate approx 18 months to finish based on my expected build time availability (I travel a lot for work).
I think one of the big efficiency factors for me at least is when I can devote a whole day to the project and concentrate rather than 1 hour here or there. Another factor to consider is having all the parts available when you need them so you can get on with it rather than waiting for UPS deliveries. It impacts cash flow but helps the build process, for example I bought all the avionics and electronics up front so I can do the mechanical and wiring without interruption.
As has been stated it is a very individual endevour that takes individual circumstances and choices so there is not one answer.
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
All times are GMT -6. The time now is 10:38 AM.
|