Quote:
Originally Posted by Nedimbek
Looking great!
I have a question:
You're building in Canada. It is required to have a "pre-cover" inspection before closing the structures. If I'm seeing correct the LE of HS is all closed now. How are you gonna pass pre-cover? Or am I missing something? Just curious.
Thanks.
|
Yes a pre closure inspection is required in Canada via the MD-RA
The forward centre ribs HS00006's are just clecoed in place. when removed the inside HS707 forward ribs are visible with a flashlight/ bora scope. The rear spar is also temp clecoed in to inspect everything else.