|
-
POSTING RULES

-
Donate yearly (please).
-
Advertise in here!
-
Today's Posts
|
Insert Pics
|

08-01-2016, 10:33 AM
|
 |
|
|
Join Date: Jul 2009
Location: Wilsonville, OR
Posts: 453
|
|
Gap between canopy side rails and fuselage
I am getting ready to take our -7 down for paint in a few weeks and am working on some bodywork and fiberglass finishing. Since finishing the airplane, I have had a small gap between the canopy side rails and canopy deck. With the canopy latched, the gap is about 3/32" on the left side and 3/16" on the right side. I'm trying to figure out what I can/should do to close the gap. Should I add a strip of .063 aluminum to the outside of the existing canopy rails that will hang down 1/4" so it overlaps the fuselage side skin (seems it would be a lot of work as I'd have to drill out the lower line of rivets and add another row between the existing two rows)? Or would it be better to add several fiberglass layups to overlap of the fuselage side skin? Fiberglass would certainly be a lot faster and easier and would probably look better since the upper edge can be feathered into the existing metal side rails. Only issue with fiberglass is that I wouldn't be able to remove the canopy and set it on two 2x4's laying horizontally as the fiberglass would be the lowest surface hanging below the metal and would likely break or crack.
I know this is a common issue so looking for advice...

__________________
________
Trevor Conroy CFII, MEI
Airbus Pilot
N781TD
RV-7
First Flight - April 12, 2015
Construction Log
|

08-01-2016, 10:36 AM
|
 |
|
|
Join Date: Mar 2006
Location: Newport, TN
Posts: 7,496
|
|
I did fiberglass side skirts overhanging the fuse.
Works great!
|

08-01-2016, 10:50 AM
|
|
|
|
Join Date: Oct 2005
Location: Geneva, AL
Posts: 491
|
|
Quote:
Originally Posted by Brantel
I did fiberglass side skirts overhanging the fuse.
Works great!
|
+1 for the fiberglass fix. It works great, just have to be sure to really scuff the aluminum before glassing.
__________________
Paul Rose
RV-9A 91300
N417PR
SERFI 2013 Awards
Inspection Complete!!! 7/7/12
First Flight 7/22/12
|

08-01-2016, 10:53 AM
|
 |
|
|
Join Date: Mar 2006
Location: Newport, TN
Posts: 7,496
|
|
I buried some rivets in mine to help prevent delamination...
|

08-03-2016, 11:36 AM
|
 |
|
|
Join Date: Jul 2009
Location: Wilsonville, OR
Posts: 453
|
|
Thank you!
__________________
________
Trevor Conroy CFII, MEI
Airbus Pilot
N781TD
RV-7
First Flight - April 12, 2015
Construction Log
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Linear Mode
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
All times are GMT -6. The time now is 12:07 PM.
|