VansAirForceForums  
Home > VansAirForceForums

- POSTING RULES
- Donate yearly (please).
- Advertise in here!

- Today's Posts | Insert Pics

  #1  
Old 06-06-2016, 09:42 PM
rjhecker rjhecker is offline
 
Join Date: Oct 2015
Location: Spokane
Posts: 18
Default building as a business

Good evening AirForce,
I am a few days away from finishing my RV-10 empennage kit and while building, I have fallen in love with the process just as much as flying itself, and that got me thinking...

Have you or have you heard of a home builder starting a Limited Liability Company building parts for those that either don't have the desire to build again or maybe bought a plane already built and are in need of a section i.e.( rudder, VS, HS) to replace or maybe they got over their heads...

Just thinking out loud about ways to keep building in-between my own sections and further into the future.

Thanks,
Robert
__________________
Robert

Last edited by rjhecker : 06-06-2016 at 09:45 PM.
Reply With Quote
  #2  
Old 06-06-2016, 09:50 PM
ColoRv's Avatar
ColoRv ColoRv is offline
 
Join Date: Apr 2012
Location: Tampa (BKV)
Posts: 926
Default

Builders assistance is a common business. There are many available. Some of which, like Rick in here....build astonishing aircraft.
__________________
RV-8 Flying
1,235th flying RV8
SARL Race#95
SnF Homebuilt Judge

2015 Sun n Fun Kit Built Reserve Grand Champion
2015 Oshkosh Kit Built Champion
2015 Jeffco Kit Built Grand Champion
2014 Oshkosh Outstanding Workmanship Award

Broken Warrior of the Jarhead Clan
Reply With Quote
  #3  
Old 06-06-2016, 10:13 PM
rjhecker rjhecker is offline
 
Join Date: Oct 2015
Location: Spokane
Posts: 18
Default

Quote:
Originally Posted by ColoRv View Post
Builders assistance is a common business. There are many available. Some of which, like Rick in here....build astonishing aircraft.
Great option thank you
__________________
Robert
Reply With Quote
  #4  
Old 06-07-2016, 04:33 AM
APACHE 56 APACHE 56 is offline
 
Join Date: Jan 2008
Location: MERRITT ISLAND, FL
Posts: 360
Default

Quote:
Originally Posted by rjhecker View Post
Good evening AirForce,


Have you or have you heard of a home builder starting a Limited Liability Company building parts for those that either don't have the desire to build again or maybe bought a plane already built and are in need of a section i.e.( rudder, VS, HS) to replace or maybe they got over their heads...
Here's an example of a company just down the road from me:
http://www.2bumsaircraftinc.com/
__________________
Don Stiver
RV8 "Little Pill" N6371S, Merritt Island, Fl.
BPE IO-390, Dual P-mag, MT 3-blade, AFP system
Steen Skybolt: Sold
Reply With Quote
  #5  
Old 06-07-2016, 06:07 AM
pierre smith's Avatar
pierre smith pierre smith is offline
 
Join Date: Jan 2005
Location: Louisville, Ga
Posts: 7,840
Default Sub parts are ok.

Bear in mind the 51% rule. The builder has to show that he built at least 51% of the airplane, although it seems there are complete airplanes built for pay, albeit illegally.

Instrument panel assembly and wiring are common assistance features, as are gas tank building and other sub part manufacturing.

Best,
__________________
Pierre Smith
RV-10, 510 TT
RV6A (Sojourner) 180 HP, Catto 3 Bl (502Hrs), gone...and already missed
Air Tractor AT 502B PT 6-15 Sold
Air Tractor 402 PT-6-20 Sold
EAA Flight Advisor/CFI/Tech Counselor
Louisville, Ga

It's never skill or craftsmanship that completes airplanes, it's the will to do so,
Patrick Kenny, EAA 275132


Dues gladly paid!
Reply With Quote
  #6  
Old 06-07-2016, 08:10 AM
airguy's Avatar
airguy airguy is offline
 
Join Date: Oct 2006
Location: Garden City, Tx
Posts: 5,118
Default

Quote:
Originally Posted by pierre smith View Post
Bear in mind the 51% rule. The builder has to show that he built at least 51% of the airplane
Correct me if I'm wrong (happens occasionally, I did get married 3 times) but isn't this actually 51% of the TASKS associated with building the airplane? Repetition of a learned task doesn't advance the task count? If you demonstrate that you can properly set a rivet, then someone else can set the next few hundred, etc?
__________________
Greg Niehues - SEL, IFR, Repairman Cert.
Garden City, TX VAF 2020 dues paid
N16GN flying 700 hrs and counting; IO360, SDS, WWRV200, Dynon HDX, 430W
Built an off-plan RV9A with too much fuel and too much HP. Should drop dead any minute now.
Reply With Quote
  #7  
Old 06-07-2016, 08:14 AM
Sam Buchanan's Avatar
Sam Buchanan Sam Buchanan is offline
been here awhile
 
Join Date: Dec 2004
Location: North Alabama
Posts: 4,300
Default

Quote:
Originally Posted by pierre smith View Post
Bear in mind the 51% rule. The builder has to show that he built at least 51% of the airplane, although it seems there are complete airplanes built for pay, albeit illegally.

Instrument panel assembly and wiring are common assistance features, as are gas tank building and other sub part manufacturing.

Best,
Just for clarification, the rule states the aircraft must be at least 51% built by amateur builder(s). The number of builders is not an issue, there can be as many as desired as long as they are not a commercial enterprise. The owner of the kit may complete as much or as little as he desires as long as the remainder of the 51% is amateur-built.
__________________
Sam Buchanan
RV-6
Fokker D.VII replica
Reply With Quote
  #8  
Old 06-07-2016, 08:40 AM
lr172 lr172 is offline
 
Join Date: Oct 2013
Location: Schaumburg, IL
Posts: 5,277
Default

Quote:
Originally Posted by Sam Buchanan View Post
Just for clarification, the rule states the aircraft must be at least 51% built by amateur builder(s). The number of builders is not an issue, there can be as many as desired as long as they are not a commercial enterprise. The owner of the kit may complete as much or as little as he desires as long as the remainder of the 51% is amateur-built.
To add to this, an amateur builder can use commercial help/support and as long as they are in the presence of the support personnel at all times work is being done, this counts as the amateur built portion.

Larry
__________________
N64LR - RV-6A / IO-320, Flying as of 8/2015
N11LR - RV-10, Flying as of 12/2019
Reply With Quote
  #9  
Old 06-07-2016, 10:20 AM
Ironflight's Avatar
Ironflight Ironflight is offline
VAF Moderator / Line Boy
 
Join Date: Jan 2005
Location: Dayton, NV
Posts: 12,243
Default

Quote:
Originally Posted by lr172 View Post
To add to this, an amateur builder can use commercial help/support and as long as they are in the presence of the support personnel at all times work is being done, this counts as the amateur built portion.

Larry
Can you cite the official document that says that Larry? I have never read it anywhere.

No, you can't just set up a nice table and comfy chair in the back of a hangar and watch as someone builds your airplane, then sign the form saying you built it without perjuring yourself.

Yes, the very fast build "two weeks to taxi" programs take advantage of the wording that you must complete 51% of the TASKS listed on the FAA checklist - so when it says "rivet a wing skin", you only have to do one, then you can let the shop do the rest.
__________________
Paul F. Dye
Editor at Large - KITPLANES Magazine
RV-8 - N188PD - "Valkyrie"
RV-6 (By Marriage) - N164MS - "Mikey"
RV-3B - N13PL - "Tsamsiyu"
A&P, EAA Tech Counselor/Flight Advisor
Dayton Valley Airpark (A34)
http://Ironflight.com
Reply With Quote
  #10  
Old 06-07-2016, 10:24 AM
lr172 lr172 is offline
 
Join Date: Oct 2013
Location: Schaumburg, IL
Posts: 5,277
Default

Quote:
Originally Posted by Ironflight View Post
Can you cite the official document that says that Larry? I have never read it anywhere.

No, you can't just set up a nice table and comfy chair in the back of a hangar and watch as someone builds your airplane, then sign the form saying you built it without perjuring yourself.

Yes, the very fast build "two weeks to taxi" programs take advantage of the wording that you must complete 51% of the TASKS listed on the FAA checklist - so when it says "rivet a wing skin", you only have to do one, then you can let the shop do the rest.
I'll try to find it and post. I bought a partially completed kit and did a lot of research to be sure that I would be in compliance. The regs made logical sense. If you don't really know what your doing, the FAA doesn't want to put regs in place that will keep you from getting the support you need.

EDIT: I am struggling to find it. To be clear, I was not talking about "Commercial Assistance" that the FAA defines as contracting out the work to someone else. This was related to having a professional help you for compensation. The language was clear that the builder must be present at all times, but that it was OK for the work to be performed by the paid assistant. This probably fell under the Educational assistance clause. I'll keep looking.

Larry
__________________
N64LR - RV-6A / IO-320, Flying as of 8/2015
N11LR - RV-10, Flying as of 12/2019

Last edited by lr172 : 06-07-2016 at 10:55 AM.
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 11:37 AM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.