VansAirForceForums  
Home > VansAirForceForums

- POSTING RULES
- Donate yearly (please).
- Advertise in here!

- Today's Posts | Insert Pics


Go Back   VAF Forums > Main > RV General Discussion/News
Register FAQ Members List Calendar Today's Posts

Reply
 
Thread Tools Search this Thread Display Modes
  #1  
Old 12-09-2006, 09:39 AM
prkaye prkaye is offline
 
Join Date: Jun 2006
Location: Ottawa, Ontario, Canada
Posts: 2,116
Default trailing edge - proseal set time

After applying proseal to trailing edges and clecoeing down through aluminum angle, how long should I wait before removing the clecoes? How long before I should do the back-riveting?
__________________
Phil
RV9A (SB)
Flying since July 2010!
Ottawa, Canada
Reply With Quote
  #2  
Old 12-09-2006, 09:45 AM
frankh's Avatar
frankh frankh is offline
 
Join Date: Jul 2006
Location: Corvallis Oregon
Posts: 3,547
Default depends

on if you got the mixture right.

If you did (and its warm) you could set the rivets in about an hour.

But I have guessed at proseal mixes and its taken 24 hours to set before.

I left mine for about 2 weeks as I could not see the hurry.

If I were doing it again I would wait till the rubbery stage (i.e not quite set but pretty gooey)...Remove the clecos and get all the excess proseal off.

Then re-cleco it with fresh clecos for 24 hours.

That way you get max strength to prevent warping/pillowing but you wont have to remove the hard proseal.

Frank
Reply With Quote
  #3  
Old 12-09-2006, 10:35 AM
alpinelakespilot2000 alpinelakespilot2000 is offline
 
Join Date: Jan 2005
Posts: 3,642
Default

You might be able to do it sooner as Frank suggests, but I waited about 5 days in a 60 degree garage. All of my trailing edges are arrow straight. You will have no problem taking the clecoes out later, especially if you didn't use an excess of proseal.
__________________
Steve M.
Ellensburg WA
RV-9 Flying, 0-320, Catto

Donation reminder: Jan. 2021
Reply With Quote
  #4  
Old 12-09-2006, 10:56 AM
LettersFromFlyoverCountry's Avatar
LettersFromFlyoverCountry LettersFromFlyoverCountry is offline
 
Join Date: Jan 2005
Location: St. Paul, MN.
Posts: 4,792
Default

I waited a day. I kinda wish I'd waited less time because pulling the angle off was a bit of a PITA with the cured ProSeal. You have to be careful to make sure pulling off the angle isn't pulling apart the seams of the trailing edge too.
__________________
Bob Collins
St. Paul, MN.
Blog: Letters From Flyover Country
RV-12iS Powerplant kit
N612EF Builder log (EAA Builder log)
Reply With Quote
  #5  
Old 12-09-2006, 11:29 AM
alpinelakespilot2000 alpinelakespilot2000 is offline
 
Join Date: Jan 2005
Posts: 3,642
Default

Quote:
Originally Posted by Bob Collins
I waited a day. I kinda wish I'd waited less time because pulling the angle off was a bit of a PITA with the cured ProSeal. You have to be careful to make sure pulling off the angle isn't pulling apart the seams of the trailing edge too.
Good point Bob. How I solved this problem is by running my Boelube over the angle to which I clecoed the trailing edges. Proseal doesn't stick to Boelube. Worked great.
__________________
Steve M.
Ellensburg WA
RV-9 Flying, 0-320, Catto

Donation reminder: Jan. 2021
Reply With Quote
  #6  
Old 12-09-2006, 02:53 PM
LettersFromFlyoverCountry's Avatar
LettersFromFlyoverCountry LettersFromFlyoverCountry is offline
 
Join Date: Jan 2005
Location: St. Paul, MN.
Posts: 4,792
Default

I wished I'd thought of that at the time. Great idea. Building a plane, I'm starting to realize, is like growing up. Near the end you realize that maybe you'd like to do it again, now that you know what you know.
__________________
Bob Collins
St. Paul, MN.
Blog: Letters From Flyover Country
RV-12iS Powerplant kit
N612EF Builder log (EAA Builder log)
Reply With Quote
  #7  
Old 12-10-2006, 10:47 PM
cnpeters cnpeters is offline
 
Join Date: Jun 2006
Location: St. Louis (Eureka), MO
Posts: 283
Default

Phil,
I waited 3 days - the proseal wasn't fully cured (I even brought the parts into the warmer basement than the garage shop). It was enough to keep it straight when I backriveted - just follow Van's rivet sequencing recommendations and hold the elevator (or rudder) flat on your work surface. I actually shimmed the elevator on wood planks the same thickness as the steel back-riveting plate, and slid the plate side to side under the trailing edge to rivet. Some folks have put on weights to the elevator to hold it flat (lead shot bags, sand, boards), but I held it as I riveted and frequently checked the TE. A tip on removing the angle that will likely be stuck to the TE - I rolled it off from front to back to unstick it so it wouldn't debond the trailing edge.
__________________
Carl Peters
St. Louis, MO
RV-9A finishing kit
http://www.mykitlog.com/cnpeters
Reply With Quote
Reply



Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 02:28 AM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.