VansAirForceForums  
Home > VansAirForceForums

- POSTING RULES
- Donate yearly (please).
- Advertise in here!

- Today's Posts | Insert Pics


Go Back   VAF Forums > RV Firewall Forward Section > Electronic Ignition Systems
Register FAQ Members List Calendar Today's Posts

Reply
 
Thread Tools Search this Thread Display Modes
  #1  
Old 01-13-2015, 09:13 AM
Ironflight's Avatar
Ironflight Ironflight is offline
VAF Moderator / Line Boy
 
Join Date: Jan 2005
Location: Dayton, NV
Posts: 12,247
Default Lightspeed Igintion Wiring Question

I am helping someone wire up a new plane and he has dual Lightspeed ignitions. The manual doesn't have a single, overall wiring diagram, so I have a quick question - is the power input to the box essentially the ignition switch? In other words, do I need a power switch AND an ignition switch, or just a single switch? Not going to use a key switch, just toggles.

Paul
__________________
Paul F. Dye
Editor at Large - KITPLANES Magazine
RV-8 - N188PD - "Valkyrie"
RV-6 (By Marriage) - N164MS - "Mikey"
RV-3B - N13PL - "Tsamsiyu"
A&P, EAA Tech Counselor/Flight Advisor
Dayton Valley Airpark (A34)
http://Ironflight.com
Reply With Quote
  #2  
Old 01-13-2015, 09:19 AM
Dan Langhout's Avatar
Dan Langhout Dan Langhout is offline
 
Join Date: Mar 2008
Location: Huntsville, AL USA
Posts: 545
Default Single Switch

I have a Plasma II+ and just use a single locking toggle on the power input. (It does go through a 5A circuit breaker as well).
__________________
Dan Langhout
2020 =VAF= Dues PAID . . . . .
RV-7 N528DP slow build
First Flight July 26th, 2014
665 hours and counting . . . .
Now based at Moontown (3M5)
Reply With Quote
  #3  
Old 01-13-2015, 09:20 AM
vic syracuse vic syracuse is offline
Super Moderator
 
Join Date: May 2005
Location: Locust Grove, GA
Posts: 2,624
Default Both

Paul, you run power directly from the battery to an appropriately-sized breaker (5 amp for 4 cylinder and 7.5 amp for 6 cylinder) and then to the Box. You also run a switch (I use the right mag function on the key switch) and it will operate normally when you are doing mag checks or want to turn it off.
__________________
Vic Syracuse

Built RV-4, RV-6, 2-RV-10's, RV-7A, RV-8, Prescott Pusher, Kitfox Model II, Kitfox Speedster, Kitfox 7 Super Sport, Just Superstol, DAR, A&P/IA, EAA Tech Counselor/Flight Advisor, CFII-ASMEL/ASES
Kitplanes "Unairworthy" monthly feature
EAA Sport Aviation "Checkpoints" column
EAA Homebuilt Council Chair/member EAA BOD
Author "Pre-Buy Guide for Amateur-Built Aircraft"
www.Baselegaviation.com
Reply With Quote
  #4  
Old 01-13-2015, 09:31 AM
bcondrey bcondrey is offline
 
Join Date: Jan 2005
Location: Bellevue, NE
Posts: 524
Default

There are 2 ways to wire the LSE boxes:
1) simple switched power input (fed through a CB)
2) power input through a CB and use the "keyswitch option" which is another wire (pin 1 on the Output connector) which goes to a keyswitch just like a mag. Wiring this way emulates mag behavior with the keyswitch. While the box always has power (Klaus wants the power fed directly from the battery & unswitched), it does not draw any current unless the keyswitch enables the ignition.

Above is for both the Plasma II+ and Plasma III ignitions, see note 4 on the INPUT connector document below.
http://www.lsecorp.com/Images/PlasmaOUTPUT.pdf
http://www.lsecorp.com/Images/PlasmaINPUT.pdf


Bob
Reply With Quote
  #5  
Old 01-13-2015, 10:08 AM
Ironflight's Avatar
Ironflight Ironflight is offline
VAF Moderator / Line Boy
 
Join Date: Jan 2005
Location: Dayton, NV
Posts: 12,247
Default

Got it - thanks guys.

Paul
__________________
Paul F. Dye
Editor at Large - KITPLANES Magazine
RV-8 - N188PD - "Valkyrie"
RV-6 (By Marriage) - N164MS - "Mikey"
RV-3B - N13PL - "Tsamsiyu"
A&P, EAA Tech Counselor/Flight Advisor
Dayton Valley Airpark (A34)
http://Ironflight.com
Reply With Quote
  #6  
Old 01-13-2015, 10:11 AM
DanH's Avatar
DanH DanH is offline
 
Join Date: Oct 2005
Location: 08A
Posts: 9,477
Default

Some aircraft have a long wire run (a rear battery -8, for example) between the main battery and the panel or EI box. If you're uncomfortable with running 10~14 feet of un-fused power lead through structure and past moving parts, installing a fusible link at the battery terminal may be a happy choice. With a fusible link at the battery, I'd eliminate the circuit breaker, go direct to the EI box, and run the switch lead for run-up checks.

http://www.aeroelectric.com/articles.../fuselink.html
__________________
Dan Horton
RV-8 SS
Barrett IO-390
Reply With Quote
Reply



Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 04:18 AM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.