Michael-
You are correct that those bolts need to be in there before you put the top skins on or you'll have to take the whole bellcrank off. You're not the first one to see this problem with the plans, so no worries there.
I think there are other threads on the weld vs. rivet question. Because I had a friend who welds (he's building a scratch built Super Cub), I just had him do it. Enough people had trouble with those long rivets folding over that I took advantage of the opportunity a friend provided. Though the rivets are plenty strong if set well I'm sure, the weld is even stronger, looks fantastic, and it only took about 20 minutes to do both. I suspect a welding shop could do it for just a small charge.
Others will, I'm sure, relate their positive experiences riveting these, so this is all FWIW. Good luck.