VansAirForceForums  
Home > VansAirForceForums

- POSTING RULES
- Donate yearly (please).
- Advertise in here!

- Today's Posts | Insert Pics


Go Back   VAF Forums > Main > RV General Discussion/News
Register FAQ Members List Calendar Today's Posts

Reply
 
Thread Tools Search this Thread Display Modes
  #1  
Old 01-31-2014, 07:54 PM
pilot28906 pilot28906 is offline
 
Join Date: Apr 2006
Location: Murphy, NC
Posts: 532
Default How many more hours?

Building a 7, basic day/night VFR, fixed pitch prop, simple interior, and probably no paint for a while.

Question: How many build hours does it normally take after flipping the "canoe"?

Thanks
__________________
John Johnson
Murphy, NC
RV7
Reply With Quote
  #2  
Old 01-31-2014, 08:03 PM
hydroguy2's Avatar
hydroguy2 hydroguy2 is offline
 
Join Date: Sep 2006
Location: Townsend, Montana
Posts: 3,179
Default

about 613.7hrs
__________________
Retired Dam guy. Life is good.
Brian, N155BKsold but bought back.
Reply With Quote
  #3  
Old 01-31-2014, 08:07 PM
UnPossible's Avatar
UnPossible UnPossible is offline
 
Join Date: Jan 2008
Location: Granbury, TX
Posts: 543
Default

I worked pretty steady on mine, working 3-4 evenings a week and usually getting at least 1 good day each weekend.....

I did not "flip" the canoe, as I used a QB, but if it helps, my Quick build kit arrived in August of 2009, and my first flight was in June of 2012.... there is a lot of systems work to do even on a simple plane.
__________________
Jason Tremble
RV-7A (Flying and Sold)
RV-10 in process (@#$$%# Cabin Top & Doors)
Paid for 2020
Reply With Quote
  #4  
Old 01-31-2014, 08:09 PM
alpinelakespilot2000 alpinelakespilot2000 is offline
 
Join Date: Jan 2005
Posts: 3,642
Default

I flipped the canoe after about 1.5 years total. Took me 7 overall to finish. Put differently, 1000 hours to flip, 2300+ overall to finish to same stage you're talking about.
__________________
Steve M.
Ellensburg WA
RV-9 Flying, 0-320, Catto

Donation reminder: Jan. 2021
Reply With Quote
  #5  
Old 02-01-2014, 04:14 AM
rleffler's Avatar
rleffler rleffler is offline
 
Join Date: Jun 2006
Location: Delaware, OH (KDLZ)
Posts: 4,194
Default

Unfortunately, the question you're asking is very similar to asking how long does it take to run a marathon. For the winner, the answer is pretty predictable. But for the rest of runners, they are typically scattered hours later. The same is true with building a RV.

I found that it's best not even to think about hours left. In my case, Van's states that the RV-10 should take about 2,200 hours. I spent an additional thousand hours on mine and just over six years. Some reasons for my variances are:
  • First time builder
  • Laid of in the middle of the build. Extended duration, but didn't add hours
  • Quite a few modifications or deviations from the plans
  • Significant differences in the panel and interior
  • When about all I had left was the fiberglass, I procrastinated until it was too cold to do it. I lost six months, but it didn't require additional hours.
  • Two surgical procedures during the build.
That also is where the saying, 95% done, 95% left to go comes from. You'll find as you get closer to completion, you'll find things to do that aren't in the plans and you didn't think about them earlier.

Good luck and enjoy your build! I know I did.

Bob
__________________
Bob Leffler
N410BL - RV10 Flying
http://mykitlog.com/rleffler
Reply With Quote
  #6  
Old 02-01-2014, 09:07 AM
crabandy crabandy is offline
 
Join Date: Jan 2010
Location: Ottawa, Ks
Posts: 2,188
Default

Quote:
Originally Posted by alpinelakespilot2000 View Post
I flipped the canoe after about 1.5 years total. Took me 7 overall to finish. Put differently, 1000 hours to flip, 2300+ overall to finish to same stage you're talking about.
Ditto.
I had the airframe mostly complete and canopy partially complete in 2 1/2 years. I spent 3 1/2 years on finishing the canopy/small items while saving $$ and taking care of kiddo #2. Bought an engine and spent the next 1 1/2 years saving and working on the cowling and wheelpants. The next 1 1/2 years I hit it hard 20-25 hours a week average (doesn't sound like hitting it hard but working full time, 2 kiddos under 5 and a wife in school) to install wiring/panel/FWF/final assembly. I flew 1 month shy of 9 years after receiving the tail kit just after the birth of kiddo #3 (Whew, probably another 3 1/2 years before I can build another!). I stopped tracking official build hours but I'm in the neighborhood of 3000-3500. My next build would be close to the low 2000 hours because I wouldn't be scratching my head so much.
Best of luck, the journey is part of the destination.
__________________
RV 7 400 hours and counting
19 donation done
Reply With Quote
  #7  
Old 02-01-2014, 01:43 PM
rvbuilder2002's Avatar
rvbuilder2002 rvbuilder2002 is offline
 
Join Date: Jul 2005
Location: Hubbard Oregon
Posts: 9,026
Default

Benchmarking it against your rate of progress, figure on being somewhere in the vicinity of being 1/2 done (very dependant on choices you make for installed equipment, etc.)
__________________
Opinions, information and comments are my own unless stated otherwise. They do not necessarily represent the direction/opinions of my employer.

Scott McDaniels
Van's Aircraft Engineering Prototype Shop Manager
Hubbard, Oregon
RV-6A (aka "Junkyard Special ")
Reply With Quote
  #8  
Old 02-01-2014, 05:27 PM
AF_Alan's Avatar
AF_Alan AF_Alan is offline
 
Join Date: Jul 2007
Location: Eugene, OR
Posts: 122
Default another data point

As others have said, it all depends. I did like the before/after comparison so...

I was a first time builder with simple day/night VFR Dynon SV plane. I did a vertical induction IO320 which added some time. Excluding paint I had 1200 to roll canoe and 1400 after to DAR inspection.

Small bites....
__________________
Alan
RV-9A N984AW
Reply With Quote
  #9  
Old 02-01-2014, 05:38 PM
jjconstant's Avatar
jjconstant jjconstant is offline
 
Join Date: Dec 2006
Location: Oakland CA
Posts: 771
Default

I recall an estimate rule of thumb that seemed pretty accurate:

1/3 airframe
1/3 systems
1/3 finishing

To quote the Vans guys regarding the canopy build issues alone: "consider it a right of passage"
__________________
All Best

Jeremy Constant
RV7A "Stella Luna" ECI IO-360 WW200RV Pmags 360hrs
VAF 2019 paid plus some for those who can't
Reply With Quote
  #10  
Old 02-01-2014, 06:40 PM
rzbill's Avatar
rzbill rzbill is offline
 
Join Date: Nov 2005
Location: Asheville, NC
Posts: 2,690
Default

For mine

RV standard build
1000 hrs in the first year took me from SB to approximate equivalent of quickbuild starting construction state.

2000 more hrs over the next 6 years.
No builder assistance in panel or anything.
__________________
Bill Pendergrass
ME/AE '82
RV-7A: Flying since April 15, 2012. 850 hrs
YIO-360-M1B, mags, CS, GRT EX and WS H1s & A/P, Navworx
Unpainted, polished....kinda'... Eyeballin' vinyl really hard.
Yeah. The boss got a Silhouette Cameo 4 Xmas 2019.

Last edited by rzbill : 02-01-2014 at 06:46 PM.
Reply With Quote
Reply



Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 11:32 AM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.