VansAirForceForums  
Home > VansAirForceForums

- POSTING RULES
- Donate yearly (please).
- Advertise in here!

- Today's Posts | Insert Pics


Go Back   VAF Forums > Main > RV General Discussion/News
Register FAQ Members List Calendar Today's Posts

Reply
 
Thread Tools Search this Thread Display Modes
  #1  
Old 08-17-2006, 03:39 PM
rv9builder rv9builder is offline
 
Join Date: Jan 2005
Location: Irvine, CA
Posts: 872
Default RV-9A slider canopy side skirt problems

When I cleco the side skirts to the slider frame, the skirts follow the contour of the fuselage almost perfectly. When I then cleco the skirts to the canopy bubble, the skirts stick out from the sides of the fuselage. They would need to be bent back about 5 degrees to be parallel with the fuselage again. Did anybody else have this problem? If so, how did you solve it?

Thank you,
__________________
Mark
RV-12iS Fuselage
RV-9A Project: Sold

VAF donation made for 2020
Reply With Quote
  #2  
Old 08-17-2006, 09:38 PM
vlittle's Avatar
vlittle vlittle is offline
 
Join Date: Jan 2005
Location: Victoria, Canada
Posts: 2,247
Default

I had the same problem. I inserted a shim strip along the top under the side skirt to prevent the side skirt from bowing out at the bottom when clecoed or riveted in place.

Vern Little
Reply With Quote
  #3  
Old 08-17-2006, 10:50 PM
rv9builder rv9builder is offline
 
Join Date: Jan 2005
Location: Irvine, CA
Posts: 872
Default

Quote:
Originally Posted by vlittle
I had the same problem. I inserted a shim strip along the top under the side skirt to prevent the side skirt from bowing out at the bottom when clecoed or riveted in place.

Vern Little
Great idea, Vern! I assume you put the shim between the frame and the C-759 inside canopy skirt, right? How thick was the shim? Does it run the entire length of the frame? Were you still able to use the 7/64" MK-319BS pop rivets per the plans, or did you have to use longer 1/8" diameter pop rivets to attach the skirt because of the thickness of the shim?

Thanks again,
__________________
Mark
RV-12iS Fuselage
RV-9A Project: Sold

VAF donation made for 2020
Reply With Quote
  #4  
Old 08-18-2006, 11:00 AM
vlittle's Avatar
vlittle vlittle is offline
 
Join Date: Jan 2005
Location: Victoria, Canada
Posts: 2,247
Default

Quote:
Originally Posted by rv9builder
Great idea, Vern! I assume you put the shim between the frame and the C-759 inside canopy skirt, right? How thick was the shim? Does it run the entire length of the frame? Were you still able to use the 7/64" MK-319BS pop rivets per the plans, or did you have to use longer 1/8" diameter pop rivets to attach the skirt because of the thickness of the shim?

Thanks again,
I'm out of town right now, so I don't have all the details. However, here's my recollection: full length shim (I think 0.020), about 1/2" wide, located under the screws at the top of the side skirts only. Prevents the screws from pulling the top of the skirts in (and bottom skirt out).

You can try different configurations pretty easily.

FMI my canopy page
Reply With Quote
  #5  
Old 08-18-2006, 11:08 AM
rv9builder rv9builder is offline
 
Join Date: Jan 2005
Location: Irvine, CA
Posts: 872
Default

Quote:
Originally Posted by vlittle
I'm out of town right now, so I don't have all the details. However, here's my recollection: full length shim (I think 0.020), about 1/2" wide, located under the screws at the top of the side skirts only. Prevents the screws from pulling the top of the skirts in (and bottom skirt out).

You can try different configurations pretty easily.

FMI my canopy page
Thanks, Vern. I appreciate your help!
__________________
Mark
RV-12iS Fuselage
RV-9A Project: Sold

VAF donation made for 2020
Reply With Quote
Reply



Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 03:13 AM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.