VansAirForceForums  
Home > VansAirForceForums

-POSTING RULES
-Advertise in here!
- Today's Posts | Insert Pics

Keep VAF Going
w/a Donation






VAF on Twitter:
@VansAirForceNet


Go Back   VAF Forums > Model Specific > RV-12/RV-12iS
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
 
Thread Tools Search this Thread Display Modes
  #1  
Old 07-06-2014, 08:59 AM
MartySantic's Avatar
MartySantic MartySantic is offline
 
Join Date: Apr 2008
Location: Davenport, IA
Posts: 1,406
Default Van's RV-12 Notification 14-07-03 - All METAL Locknuts

Reposted to make it easier to find during a forum search.

Van’s Aircraft recommends that owners and/or operators of all RV models comply with the applicable recommendations in SAIB HQ-14-16 per Van's RV-12 Notification 14-07-03.

http://www.rotor.com/rotornews/April14/HQ-14-16.pdf

From the parts lists. Found that Van's supplied 29 locknuts for my RV-12.


Empenage Kit
Bag 2671 6 - MS21042-6

Fuselage Kit
Bag 2720 6 - MS21042-08, 2 - MS21042-3

Wing Kit
Bag 2624 2 - MS21042-08

Finish Kit
Bag 2772 2 - MS21042-08

Avionics Kit
Bag 2801 1 - MS21042-3

Powerplant Kit
Bag 2812 9 - MS21042-3, 1 - MS21042-4

Spent a little time looking. Found all of them BUT one. If someone finds it in the plans, please let all of us know! Keep in mind, my plans are 4 years old, so Van's may have re-numbered some of the plan pages.

RV-12 MS21042 Metal Locknut Locations


Empenage Kit
Bag 2671 6 - MS21042-6
Page 11-06 - Trim Motor Attachment to Tray (6)

Fuselage Kit
Bag 2720 6 - MS21042-08, 2 - MS21042-3
-08 Page 21-20 - System Block Stud Bolts (6)
-03 Page 23-07 - Vent Doors on Side of Fuselage (2)

Wing Kit
Bag 2624 2 - MS21042-08
Page 16-04 - Ground Wire to W-1205 Bracket (2)

Finish Kit
Bag 2772 2 - MS21042-08
Page 38-09 - Cowl Closeout Bracket
COULD NOT FIND the 2nd Maybe the parts list is in error?

Avionics Kit
Bag 2801 1 - MS21042-3
Page 42-11 - DG Clamp for GPS Wires

Powerplant Kit
Bag 2812 9 - MS21042-3, 1 - MS21042-4
-04 Page 46-16 - Starter Motor Ground Connection
-03 Page 45-03 - Battery Ground to Battery Tray
-03 Page 49-09 - Water Radiator Door Push Pull Cable Clamps (3)
-03 Page 49-17 - Oil Cooler Line DG Clamp
-03 Page 49-05 - Water Radiator Bolts (2)
-03 Page 49-12 - Oil Cooler Bottom Guide Bolts (2)
__________________
Marty Santic ----- W9EAA
RV-12 N128MS ----- Now Flying
My RV-12 Build Log - http://www.martysrv12.blogspot.com/
Davenport, IA

Last edited by MartySantic : 07-07-2014 at 10:05 AM.
Reply With Quote
  #2  
Old 07-07-2014, 10:02 AM
MartySantic's Avatar
MartySantic MartySantic is offline
 
Join Date: Apr 2008
Location: Davenport, IA
Posts: 1,406
Default

Found a few others by doing a .pdf word search on all of the page revisions that Van's has posted.

For those with later kits, the locknuts are used in the Skyview/Transponder installation, the new fuel pump drain line, the new fuel tank vent line, the new canopy latch microswitch. They may be used elsewhere in the lighting kit which I do not have.

They are also used in the very first iteration of the fuel tank lexan window (which were removed with new new lexan window in the S.B.).

If anyone has a complete set of plan pages in .pdf format, a complete search would be trivial. I only have the pages that have been revised.

Anyone have a COMPLETE set of plans in .pdf??
__________________
Marty Santic ----- W9EAA
RV-12 N128MS ----- Now Flying
My RV-12 Build Log - http://www.martysrv12.blogspot.com/
Davenport, IA

Last edited by MartySantic : 07-07-2014 at 10:07 AM.
Reply With Quote
  #3  
Old 01-03-2015, 05:10 PM
Phantom30's Avatar
Phantom30 Phantom30 is offline
 
Join Date: Jul 2009
Location: Coeur d'Alene, ID/Casa Grande, AZ
Posts: 654
Default

Quote:
Originally Posted by MartySantic View Post
Reposted to make it easier to find during a forum search.

Van?s Aircraft recommends that owners and/or operators of all RV models comply with the applicable recommendations in SAIB HQ-14-16 per Van's RV-12 Notification 14-07-03.

http://www.rotor.com/rotornews/April14/HQ-14-16.pdf

From the parts lists. Found that Van's supplied 29 locknuts for my RV-12.


Empenage Kit
Bag 2671 6 - MS21042-6

Fuselage Kit
Bag 2720 6 - MS21042-08, 2 - MS21042-3

Wing Kit
Bag 2624 2 - MS21042-08

Finish Kit
Bag 2772 2 - MS21042-08

Avionics Kit
Bag 2801 1 - MS21042-3

Powerplant Kit
Bag 2812 9 - MS21042-3, 1 - MS21042-4

Spent a little time looking. Found all of them BUT one. If someone finds it in the plans, please let all of us know! Keep in mind, my plans are 4 years old, so Van's may have re-numbered some of the plan pages.

RV-12 MS21042 Metal Locknut Locations


Empenage Kit
Bag 2671 6 - MS21042-6
Page 11-06 - Trim Motor Attachment to Tray (6)

Fuselage Kit
Bag 2720 6 - MS21042-08, 2 - MS21042-3
-08 Page 21-20 - System Block Stud Bolts (6)
-03 Page 23-07 - Vent Doors on Side of Fuselage (2)

Wing Kit
Bag 2624 2 - MS21042-08
Page 16-04 - Ground Wire to W-1205 Bracket (2)

Finish Kit
Bag 2772 2 - MS21042-08
Page 38-09 - Cowl Closeout Bracket
COULD NOT FIND the 2nd Maybe the parts list is in error?

Avionics Kit
Bag 2801 1 - MS21042-3
Page 42-11 - DG Clamp for GPS Wires

Powerplant Kit
Bag 2812 9 - MS21042-3, 1 - MS21042-4
-04 Page 46-16 - Starter Motor Ground Connection
-03 Page 45-03 - Battery Ground to Battery Tray
-03 Page 49-09 - Water Radiator Door Push Pull Cable Clamps (3)
-03 Page 49-17 - Oil Cooler Line DG Clamp
-03 Page 49-05 - Water Radiator Bolts (2)
-03 Page 49-12 - Oil Cooler Bottom Guide Bolts (2)
How about the one securing the fuel tank vent line clamp backside the bulkhead rear of the fuel tank?
__________________
Ric Dickison
307 (CAB) Phantom
Search and Destroy (Can
Tho RVN)
Distinguished Flying Cross Society Member
CH-47 & UH-1H "Driver"
Rotax 9 Series Service IRMT

RV-12 Kit#729 "N312RD" is now a full functioning fun machine!! Thanks Van for fulfilling my dream😎
2018 Dues Paid
Reply With Quote
  #4  
Old 01-10-2022, 01:20 PM
rgaynor rgaynor is offline
 
Join Date: Dec 2018
Location: Boca Raton, FL
Posts: 66
Default

Because this is a Sticky thread, is this Notification relevant to new builds? RV12is started in 2018. If it is still relevant, does anyone have a new link to the SAIB HQ-14-16 the posted link doesn't seem to return anything except a 404 error.

Thanks
__________________
PPL, iRMT
RV-12is
Emp. - Complete
Moved to Hangar 8/11/2019
Wings - Complete
Fuselage - Complete
Finishing - in progress
Avionics - in progress
Engine - in progress

RV-10
Emp - Complete
Wings - Being Prepped and Primed
Fuselage - Crating February
Finishing - Ordered Awaiting Ship Date

2023 Dues Paid
Reply With Quote
  #5  
Old 01-10-2022, 03:26 PM
thiggins thiggins is offline
 
Join Date: Mar 2020
Location: Saluda,NC
Posts: 225
Default

Quote:
Originally Posted by rgaynor View Post
Because this is a Sticky thread, is this Notification relevant to new builds? RV12is started in 2018. If it is still relevant, does anyone have a new link to the SAIB HQ-14-16 the posted link doesn't seem to return anything except a 404 error.

Thanks
Not to hijack, but this is exactly the scenario this is about…

https://vansairforce.net/community/s...d.php?t=202219
__________________
Donation 2023 paid
ASEL INST COMM Tail-wheeler
RV-12iS builder (Empennage complete, Wings complete!, Fuselage well under way!, finish kit under way!, Garmin avionics under way!, engine ordered, shop out of order )
Got a hangar, and moved some large pieces in!
https://eaabuilderslog.org/?blproject&proj=7buPHH99v
Reply With Quote
  #6  
Old 01-11-2022, 12:07 AM
c4c67b c4c67b is offline
 
Join Date: Dec 2021
Location: elsewhere
Posts: 21
Default

Quote:
Originally Posted by rgaynor View Post
does anyone have a new link to the SAIB HQ-14-16 the posted link doesn't seem to return anything except a 404 error.
FAA link:
https://rgl.faa.gov/Regulatory_and_G...E/HQ-14-16.pdf

Archive version: http://web.archive.org/web/201701250...E/HQ-14-16.pdf
Reply With Quote
  #7  
Old 01-11-2022, 03:52 PM
rgaynor rgaynor is offline
 
Join Date: Dec 2018
Location: Boca Raton, FL
Posts: 66
Default

Thank you much.

__________________
PPL, iRMT
RV-12is
Emp. - Complete
Moved to Hangar 8/11/2019
Wings - Complete
Fuselage - Complete
Finishing - in progress
Avionics - in progress
Engine - in progress

RV-10
Emp - Complete
Wings - Being Prepped and Primed
Fuselage - Crating February
Finishing - Ordered Awaiting Ship Date

2023 Dues Paid
Reply With Quote
  #8  
Old 01-11-2022, 03:53 PM
rgaynor rgaynor is offline
 
Join Date: Dec 2018
Location: Boca Raton, FL
Posts: 66
Default

Not a hijack at all. I now have the doc but still no idea if Van’s fixed this prior to shipping my build perhaps using a different nut. Guess I will search my parts list for this MS number.

Quote:
Originally Posted by thiggins View Post
Not to hijack, but this is exactly the scenario this is about…

https://vansairforce.net/community/s...d.php?t=202219
__________________
PPL, iRMT
RV-12is
Emp. - Complete
Moved to Hangar 8/11/2019
Wings - Complete
Fuselage - Complete
Finishing - in progress
Avionics - in progress
Engine - in progress

RV-10
Emp - Complete
Wings - Being Prepped and Primed
Fuselage - Crating February
Finishing - Ordered Awaiting Ship Date

2023 Dues Paid
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 04:30 PM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.