  #1  
Old 06-09-2020, 01:49 PM
Freakshow108's Avatar
Freakshow108 Freakshow108 is offline
 
Join Date: Sep 2018
Location: Eatonville WA
Posts: 201
Default Ordering engine

For those who have ordered a Lycoming engine through Vans during the covid shutdown, what type of lead times have you been given? I understand theses are estimates. Thanks in advance.
Reply With Quote
  #2  
Old 06-09-2020, 02:04 PM
bkervaski's Avatar
bkervaski bkervaski is offline
 
Join Date: Mar 2017
Location: Birmingham, Alabama
Posts: 1,916
Default

Word on the street says 6-9 months.
__________________
N196 RV-14A #140376 (Flying) 2019 Bronze Lindy
N169 Carbon Cub EX-3 (Finishing)
N15Z RV-15 (Waiting ... impatiently)
Reply With Quote
  #3  
Old 06-09-2020, 02:11 PM
Freakshow108's Avatar
Freakshow108 Freakshow108 is offline
 
Join Date: Sep 2018
Location: Eatonville WA
Posts: 201
Default

Quote:
Originally Posted by bkervaski View Post
Word on the street says 6-9 months.
Thank you for the response.
Reply With Quote
  #4  
Old 06-09-2020, 02:16 PM
PilotjohnS PilotjohnS is offline
 
Join Date: Jan 2016
Location: Southwest
Posts: 2,328
Default Just me

I think the lead time depends on engine type. I ordered my io320 thinking it would be a long lead time and i got it much earlier than expected.
__________________
John S

WARNING! Information presented in this post is my opinion. All users of info have sole responsibility for determining accuracy or suitability for their use.

Dues paid 2022, worth every penny

RV9A- Status:
98% done, 2% left to go
Structure done (less gear)
Electrical/Panel done
Firewall Forward 95% done
Fiberglass 90%
www.pilotjohnsrv9.blogspot.com
Reply With Quote
  #5  
Old 06-09-2020, 02:33 PM
transientair transientair is offline
 
Join Date: Apr 2012
Location: Oregon
Posts: 36
Default

I ordered my IO-390 (non Thunderbolt) engine on May 4 and I have a July 10 production date. Two notes -- (1) this was part of Van's recent notice of accelerated delivery offer, which may or may not still be available and (2) just as others have mentioned, lead times may be engine specific.
Reply With Quote
  #6  
Old 06-10-2020, 07:23 AM
PhatRV PhatRV is offline
 
Join Date: Mar 2018
Location: Buena Park, California
Posts: 828
Default

Quote:
Originally Posted by Freakshow108 View Post
For those who have ordered a Lycoming engine through Vans during the covid shutdown, what type of lead times have you been given? I understand theses are estimates. Thanks in advance.
I ordered my IO360M1B engine from Vans last week. The wait time quoted is about 6 months. Thunderbolt engines may take as long as 12 months.
__________________
RV8 (N38PV): 90% completed (90% to go)
Waiting for hangar.
Days to Final Installation: 999
Days to AWC: 999
Days to First Flight: 999
Painting: 50% completed
Donation paid through 2022
Reply With Quote
  #7  
Old 06-10-2020, 07:47 AM
Jim Ball Jim Ball is offline
 
Join Date: Sep 2016
Location: Mobile, Alabama
Posts: 53
Default Titan engine lead time

Related topic ; Titan 320, 340, 360 and 370 lead times are +- 2 months.
__________________
James Ball (J.B.)
Continental Aerospace Technologies
2039 South Broad St.
Mobile, AL 36695
Phone 251 436 8122
jball@continental.aero
Reply With Quote
  #8  
Old 06-10-2020, 11:34 AM
Freakshow108's Avatar
Freakshow108 Freakshow108 is offline
 
Join Date: Sep 2018
Location: Eatonville WA
Posts: 201
Default

Thank you to everyone for the input!
Reply With Quote
  #9  
Old 06-10-2020, 04:54 PM
RV7ForMe RV7ForMe is offline
 
Join Date: Jul 2015
Location: Florida/Europe
Posts: 651
Default

VANS said 4 months on the IO390. that was about a month ago.
__________________
VAF dues paid for 2021
RV7-A (N137MX Reserved) - Wings Started...
RV7-A - Rebuild Done - Flying!
Cessna Rocket 210HP - Best dang 172 Ever made! (sold)
Reply With Quote
  #10  
Old 06-11-2020, 12:41 PM
RYOUNG's Avatar
RYOUNG RYOUNG is offline
 
Join Date: Feb 2010
Location: NC
Posts: 90
Default

I asked Barb in kit sales for current lead time for a non-certified O-360-A1A. She said 3-4 months, thunderbolt 5-6 months.
__________________
Robert

RV-3B Flying
Wagabond Flying
RV-8 Tail completed, QB Fuselage in progress
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On