Posts: 72
Default Centre section hardware

Hi,

Could someone who has a wing kit please advise me the bag number of the Centre section fuselage hardware that includes the NAS 1307-50 bolts. I知 building a slow build fuselage while waiting for my Quick build wings and don稚 have the Close tolerance bolts needed to aid positioning of F-704ABCand D to the two centre section bulkheads. I believe they are included with the Quick build wings.
Hope that makes sense.
Thanks,
Mike
__________________
Empennage arrived
VS completed
Rudder completed
HS completed
Elevators completed
Quick Build wings, fuselage and finish kit deliverd
#140425
RV14 Kit sold sadly.
RV7 Empennage started Jan 2021
Donation paid 2019
Reply With Quote
  #2  
Old 01-27-2022, 08:29 AM
wirejock's Avatar
wirejock wirejock is offline
 
Join Date: Oct 2005
Location: Estes Park, CO
Posts: 5,102
Default Inventory

Quote:
Originally Posted by Mikeandmaz View Post
Hi,

Could someone who has a wing kit please advise me the bag number of the Centre section fuselage hardware that includes the NAS 1307-50 bolts. I知 building a slow build fuselage while waiting for my Quick build wings and don稚 have the Close tolerance bolts needed to aid positioning of F-704ABCand D to the two centre section bulkheads. I believe they are included with the Quick build wings.
Hope that makes sense.
Thanks,
Mike
Mike
Download this spreadsheet. One of the tabs is a complete 7(a) inventory
https://drive.google.com/file/d/1k28...ew?usp=sharing
__________________
Larry Larson
Estes Park, CO
wirejock at yahoo dot com
Donated 12/01/2021, plus a little extra.
RV-7A #73391, N511RV reserved (3,000+ hours)
Empennage, wings, fuse, finishing kit done. Working FWF
Disclaimer
I cannot be, nor will I be, held responsible if you try to do the same things I do and it does not work and/or causes you loss, injury, or even death in the process.
Reply With Quote
  #3  
Old 01-27-2022, 08:56 AM
Bruce's Avatar
Bruce Bruce is offline
 
Join Date: Feb 2006
Location: Anywhere, USA
Posts: 1,195
Default

Mike,
The bolts came with the fuselage.
Center section ships with slow build fuselage.


Hope it helps.

Boomer
__________________
Bruce (BOOMER) Pauley
Kathy (KAT) Pauley

RV 7A--"MISS MARIE"--- N177WD (SOLD FLYING)72742
VAF #582-----------------EAA LIFETIME MEMBER
EX -KC-135A -------------BOOM OPERATOR #3633
VAN'S FLIGHT------------#6930

RETIRED覧覧覧覧-Enjoying life

See you in OSHKOSH


http://www.mykitlog.com/users/index....ley&project=84


=VAF= 2006-2022 DUES PAID
Reply With Quote
  #4  
Old 01-27-2022, 09:08 AM
motodave motodave is offline
 
Join Date: Dec 2018
Location: Littleton, CO
Posts: 122
Default

Interesting I'm building/built my slow build fuselage before wings and understood the close tolerance bolts came with the wing kit... I was going to buy QB wings originally but given all the delays on QB kits switched in Aug and still waiting on my slow build wings!+!+! They are supposed to ship this month after talking with Greg a few times on this... I hope so as I've run out parts and only think left to do on fuselage is install the windshield when it gets a bit warmer.
__________________
Dave
RV7 Slider N732DH
YIO-360-EXP Thunderbolt
Empennage 100% Complete
Slow build Fuselage 99.9% done
Garmin G3X panel w/VPX, wiring 99% done
Wings in process...
Littleton, CO & KCFO
Photo log: https://flic.kr/ps/9jjZz
Reply With Quote
  #5  
Old 01-27-2022, 09:41 AM
wirejock's Avatar
wirejock wirejock is offline
 
Join Date: Oct 2005
Location: Estes Park, CO
Posts: 5,102
Default Inventory

Quote:
Originally Posted by Mikeandmaz View Post
Hi,

Could someone who has a wing kit please advise me the bag number of the Centre section fuselage hardware that includes the NAS 1307-50 bolts. I知 building a slow build fuselage while waiting for my Quick build wings and don稚 have the Close tolerance bolts needed to aid positioning of F-704ABCand D to the two centre section bulkheads. I believe they are included with the Quick build wings.
Hope that makes sense.
Thanks,
Mike
8 WING HARDWARE-1 *SUB KIT

BAG 1993-1 CNTR SEC. HDWRE MISC
AN3-6A BOLT
AN3-7A BOLT
AN3-10A BOLT
AN3-14A BOLT
AN4-13A BOLT
AN4-32A BOLT
NAS1304-50 HEX HEAD CLOSE TOLERANCE B
NAS1307-50 HEX HEAD CLOSE TOLERANCE B
BUSH BR-065X3/8X2.781 BELLCRANK BUSHING
AN426AD4/14 RIVET
__________________
Larry Larson
Estes Park, CO
wirejock at yahoo dot com
Donated 12/01/2021, plus a little extra.
RV-7A #73391, N511RV reserved (3,000+ hours)
Empennage, wings, fuse, finishing kit done. Working FWF
Disclaimer
I cannot be, nor will I be, held responsible if you try to do the same things I do and it does not work and/or causes you loss, injury, or even death in the process.
Reply With Quote
  #6  
Old 01-27-2022, 10:36 AM
Mikeandmaz Mikeandmaz is offline
 
Join Date: Sep 2015
Location: England
Posts: 72
Default

Thanks Larry, and all other replies, that痴 a great help. I値l see if I can order that bag separately.
Cheers,
Mike
__________________
Empennage arrived
VS completed
Rudder completed
HS completed
Elevators completed
Quick Build wings, fuselage and finish kit deliverd
#140425
RV14 Kit sold sadly.
RV7 Empennage started Jan 2021
Donation paid 2019
Reply With Quote
  #7  
Old 01-27-2022, 11:24 AM
PilotjohnS PilotjohnS is offline
 
Join Date: Jan 2016
Location: Southwest
Posts: 2,171
Default warning

Just a fair warning, those bolts fit tight. I had a hard time removing the bolts once i riveted these parts together. I would use lube and stuff. You might even consider putting the parts out in the sun and letting them heat up prior to trying to remove the steel bolts from the aluminum center section. Like I said, i had a hard time removing the bolts once the center section was riveted together.
__________________
John S

WARNING! Information presented in this post is my opinion. All users of info have sole responsibility for determining accuracy or suitability for their use.

Dues paid 2022, worth every penny

RV9A- Status:
98% done, 2% left to go
Structure done (less gear)
Electrical/Panel done
Firewall Forward 95% done
Fiberglass 70%
www.pilotjohnsrv9.blogspot.com
Reply With Quote
  #8  
Old 01-27-2022, 01:21 PM
wirejock's Avatar
wirejock wirejock is offline
 
Join Date: Oct 2005
Location: Estes Park, CO
Posts: 5,102
Default Bolts

Quote:
Originally Posted by PilotjohnS View Post
Just a fair warning, those bolts fit tight. I had a hard time removing the bolts once i riveted these parts together. I would use lube and stuff. You might even consider putting the parts out in the sun and letting them heat up prior to trying to remove the steel bolts from the aluminum center section. Like I said, i had a hard time removing the bolts once the center section was riveted together.
A set of Buller spacers and some hardware store bolts work fine for lining things up.
__________________
Larry Larson
Estes Park, CO
wirejock at yahoo dot com
Donated 12/01/2021, plus a little extra.
RV-7A #73391, N511RV reserved (3,000+ hours)
Empennage, wings, fuse, finishing kit done. Working FWF
Disclaimer
I cannot be, nor will I be, held responsible if you try to do the same things I do and it does not work and/or causes you loss, injury, or even death in the process.
Reply With Quote
  #9  
Old 01-27-2022, 02:48 PM
griffg griffg is offline
 
Join Date: Apr 2015
Location: Sydney, Australia
Posts: 61
Default AN1307-50

The AN13-7-50 and the AN1304-50 bolts came in the No:1993 pack.

When I installed my wings to set the incidence angle I used store bought bolts and ground a taper on the end at the thread location. This made it much easier to install these bolts and then remove them afterwards.

Cheers,
__________________
Gordon Griffin
RV-7A under construction
VH-NAK
IO-360-M1B
Catto 3 blade prop
Reply With Quote
  #10  
Old 01-27-2022, 04:18 PM
PilotjohnS PilotjohnS is offline
 
Join Date: Jan 2016
Location: Southwest
Posts: 2,171
Default

Quote:
Originally Posted by griffg View Post
The AN13-7-50 and the AN1304-50 bolts came in the No:1993 pack.

When I installed my wings to set the incidence angle I used store bought bolts and ground a taper on the end at the thread location. This made it much easier to install these bolts and then remove them afterwards.

Cheers,
I think i am going to do the same thing, but also grind a cup in the end. This way, if I have to use a drift punch to remove, i can protect the surrounding aluminum in the spar hole.
__________________
John S

WARNING! Information presented in this post is my opinion. All users of info have sole responsibility for determining accuracy or suitability for their use.

Dues paid 2022, worth every penny

RV9A- Status:
98% done, 2% left to go
Structure done (less gear)
Electrical/Panel done
Firewall Forward 95% done
Fiberglass 70%
www.pilotjohnsrv9.blogspot.com
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 03:54 AM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.