VansAirForceForums  
Home > VansAirForceForums

-POSTING RULES
-Advertise in here!
- Today's Posts | Insert Pics

Keep VAF Going
w/a Donation






VAF on Twitter:
@VansAirForceNet

  #1  
Old 08-29-2023, 10:40 AM
nohoflyer nohoflyer is offline
 
Join Date: Sep 2018
Location: Brooklyn, NY
Posts: 491
Default Elevator pushrod install

Van’s instructions discusses the main pushrod but no mention of the smaller one going to the stick. I also read ahead and there is no mention of reinstalling the fat tube or the small one at all.

I feel that once my empennage is attached there is no reason not to install both pushrods.

Ideas?
__________________
RV-7A builder
A320 Capt at some airline
T-37/T-38/KC-135
C-177/172
Piper Warrior
2023 donator
Emp complete
Wings complete
Fuselage 90% complete
Finishing kit in crating
25% put down on engine
Reply With Quote
  #2  
Old 08-29-2023, 11:53 AM
PilotjohnS PilotjohnS is offline
 
Join Date: Jan 2016
Location: Southwest, USA
Posts: 2,895
Default Install early

I would install the pushrod from the stick to the elevator bell crank as early as possible. It is a pain. I had to force mine in and still have the paint scratched off in places because of the force need to get it in.
__________________
John S

WARNING! Information presented in this post is my opinion. All users of info have sole responsibility for determining accuracy or suitability for their use.

Dues paid 2023, worth every penny

RV9A- Status:
Flying June 2023
www.pilotjohnsrv9.blogspot.com
or builders log here on VAF: Pilotjohns
Reply With Quote
  #3  
Old 08-29-2023, 01:40 PM
D-Dubya D-Dubya is offline
 
Join Date: May 2009
Location: Beaumont, Texas
Posts: 350
Default

There's no big advantage to installing the "fat tube" early in the process. As mentioned, it will scrape the primer or paint off if left hanging on one end, or will be in the way of other work. While you'll need to drill it to the elevator horns at some point, they will likely go in and out several times during the build. Fitting and sanding the elevator tips comes to mind.

That back pushrod is a bugger to connect properly with all the spacers and washers that are required. You can drop a bolt through there just to hold it all together in the meanwhile, but the final rigging will require that the stick grips, instrument panel with switches, and several other components be in place to ensure proper range of travel.
__________________
David Welsh
Beaumont, TX
RV-7 N413WD
Reply With Quote
  #4  
Old 09-23-2023, 03:43 AM
GregMac GregMac is offline
 
Join Date: Aug 2012
Location: Albany Western Australia
Posts: 88
Default

That pushrod from the stick to the elevator bell crank doesn’t need to be forced in scratching paint etc. Can be installed (or removed) at any time ……. Install, Lay the pushrod on the R/H side of the luggage wall vertical centre brace, then in past (forward on the LH) the stick connect up point. The pushrod then can be easily put into its position in the tunnel.
Reply With Quote
  #5  
Old 09-23-2023, 06:46 AM
Desert Rat Desert Rat is offline
 
Join Date: Aug 2018
Location: Wichita KS
Posts: 1,355
Default

^^^^
This. I've seen multiple threads talking how hard this is to install or how you have to install the tube before you rivet the ends on or it wont fit or whatever.

None of that's true. Follow the process GregMac describes and it will slide right in. You might need to remove the ends to make it a bit shorter and then screw them back on after the tube is in the tunnel. but other than that, no heroic measures required.
__________________
Terry Shortt
AGI, CFI, CFII, MEI, A&P, Janitor
RV7 Empennage & Wing done
Fuselage almost done
Avionics almost done
90% done, 90% to go
#72651
https://eaabuilderslog.org/?blprojec...t=all&listcat=
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 04:32 PM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.